Published September 7, 2021 at 8:00 PM

Updated September 15, 2023

Site work and paving for a civil project in Fayetteville, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of Sept 7 the project was awarded to Piedmont Paving Inc for $3,967,499.09. The primary purpose of the project is to provide a connection between SR 54 and Lester Road through the implementation of a multi-modal trail for pedestrians and cyclists. The project is also to promote health and wellness of the general public through multi-modal transportation facilities and connectivity to key land uses in the City of Fayetteville. This project originated from Fayette County's application for Transportation Alternative Program (TAP) funding. The pedestrian bridge will be located approximately one quarter mile to the west of Piedmont Fayette Hospital and the intersection of Togwatee Village Parkway at SR 54. The pedestrian bridge will connect at grade with the future proposed multi-use trail along SR 54 which will connect to the existing network of multi-use trails in Fayetteville and the unincorporated County. The path will be open 24 hours a day and seven days a week. The proposed facility will be monitored by the City of Fayetteville Police Department. Maintenance of the multi-use path and pedestrian bridge will be provided by the City of Fayetteville. Bid questions should be submitted in writing to Sherry White, Contract Administrator via e-mail at: swhite@fayettecountyga.gov.Questions will be accepted until 2:00pm Friday, May 28, 2021. Bid Bond: You must include a bid bond with your bid, equal to five percent (5%) of the total amount bid. Bid bonds shall be provided by a surety which appears on Georgia's list of approved sureties administered by the State Insurance Commissioner, or the U.S. Treasury's list of approved bond sureties (Circular 570). Performance and Payment Bonds: Prior to execution of a contract, the successful bidder shall submit performance bond equal to 100 percent of the contract amount, and payment bond equal to 110 percent of the contract amount, provided by a surety which appears on Georgia's list of approved sureties administered by the State Insurance Commissioner, or the U.S. Treasury's list of approved bond sureties (Circular 570).

Award

Roads / Highways

$3,967,499.00

Public - County

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
189
Bidding Soon
2,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2021

August 9, 2021

Project location map

GA-54, Fayetteville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.