BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2021 at 8:00 PM

Updated September 15, 2023

Renovation of a mixed-use development in Honolulu, Hawaii. Completed plans call for the renovation of a transportation facility.

As of October 7, 2021, a general contractor has been selected and construction is underway. No further inquiries being accepted. The scope of work at Terminal 1 consists of, but is not limited to, new construction of Transportation Security Administration (TSA) baggage screening spaces including equipment; six baggage makeup carousels; new United States Department of Agriculture (USDA) spaces and related work; demolition/reconstruction of existing tenant spaces for new Baggage Handling System (BHS) corridor; demolition of existing TSA baggage screening spaces; demolition of existing baggage makeup carousels; construction of BHS; Closed Circuit Television (CCTV); Access Control, mechanical and electrical systems and all associated work. The scope of work at Terminal 2 consists of, but is not limited to, new ticketing counters and canopies; take away conveyor belts; High-Volume Low-Speed (HVLS) ceiling fans at the ticketing level; construction of new and modifications to existing TSA baggage screening spaces, including equipment, on the apron and basement levels; and baggage makeup carousels at the apron level; demolition of existing mid-lobby ticket counters; renovations to existing airline office spaces; concrete floor repairs; lighting; fire protection system; new associated finishes on the ticketing level; demolition of baggage makeup carousels; construction of BHS at the apron and basement levels; CCTV; Access Control; mechanical and electrical systems and all associated work. ALL requests for information (RFI) shall be received in writing no later than 4:30 P. M., HST, April 13, 2020. Questions regarding this solicitation must be e-mailed to Mr. Lyle Oda, Project Manager, at lyle.oda@hawaii.gov. Questions received after the deadline will not be addressed. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. *This project has been awarded and all trades have been let.

Under Construction

Transportation Terminals

$154,784,830.00

Public - City

Renovation

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
15
Bidding Soon
265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2020

October 4, 2021

Project location map

300 Rodgers Blvd, Honolulu, HI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.