Renovation of a mixed-use development in Honolulu, Hawaii. Completed plans call for the renovation of a transportation facility.

As of October 7, 2021, a general contractor has been selected and construction is underway. No further inquiries being accepted. The scope of work at Terminal 1 consists of, but is not limited to, new construction of Transportation Security Administration (TSA) baggage screening spaces including equipment; six baggage makeup carousels; new United States Department of Agriculture (USDA) spaces and related work; demolition/reconstruction of existing tenant spaces for new Baggage Handling System (BHS) corridor; demolition of existing TSA baggage screening spaces; demolition of existing baggage makeup carousels; construction of BHS; Closed Circuit Television (CCTV); Access Control, mechanical and electrical systems and all associated work. The scope of work at Terminal 2 consists of, but is not limited to, new ticketing counters and canopies; take away conveyor belts; High-Volume Low-Speed (HVLS) ceiling fans at the ticketing level; construction of new and modifications to existing TSA baggage screening spaces, including equipment, on the apron and basement levels; and baggage makeup carousels at the apron level; demolition of existing mid-lobby ticket counters; renovations to existing airline office spaces; concrete floor repairs; lighting; fire protection system; new associated finishes on the ticketing level; demolition of baggage makeup carousels; construction of BHS at the apron and basement levels; CCTV; Access Control; mechanical and electrical systems and all associated work. ALL requests for information (RFI) shall be received in writing no later than 4:30 P. M., HST, April 13, 2020. Questions regarding this solicitation must be e-mailed to Mr. Lyle Oda, Project Manager, at lyle.oda@hawaii.gov. Questions received after the deadline will not be addressed. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. *This project has been awarded and all trades have been let.

Under Construction

Transportation Terminals

$154,784,830.00

Public - City

Renovation

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Vapor Retarders, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Non-Structural Metal Stud Framing, Suspension Systems, Portland Cement Plastering, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Exterior Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Specialty Casework, Countertops, Furnishings and Accessories, Rugs and Mats
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Data Communications, Data Communications Peripheral Data Equipment, Scanners, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Transportation Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Batching Equipment, Mixers, Piece Material Handling Equipment, Conveyors, Piece Material Conveyors, Cranes and Hoists, Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
107
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2020

October 4, 2021

img_map_placeholder

300 Rodgers Blvd, Honolulu, HI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.