BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, asbestos abatement and new construction of a mixed-use development in Mystic, Connecticut. Completed plans call for site work for a educational facility.

Addendum No. 5 has been uploaded to the SmartBidNet Plan Room. THE BID DUE DATE FOR THE FOLLOWING BID PACKAGES HAS BEEN EXTENDED TO MARCH 5, 2020 @ 2:00 P.M.: 2.05s - STRUCTURAL STEEL 2.07r - ROOFING 2.08 - ALUMINUM ENTRANCES, STORFRONTS AND CURTAINWALL THE BID DUE DATE FOR ALL OTHER REMAINING BID PACKAGES (NOT LISTED ABOVE) REMAINS FEBRUARY 25, 2020 @ 2:00 P.M. Bidders for Bid Package 2.02 - Building Abatement and Demolition shall note that they may access the existing Cutler Middle School building on Thursday, February 13, 2020 at 3:30 pm if desired. Please inform Mark Carroll of O&G Industries, Inc. at markcarroll@ogind.com if you intend to participate in this opportunity. ALL BIDDERS shall note that the bid due date for ALL bid packages is being be extended to Tuesday, February 25, 2020 at 2:00 pm. This extension will be formally included in Addendum No. 3, to be issued on Wednesday afternoon, February 12th. Cutler Elementary School consists of the construction of approximately 75,300 square feet of a new elementary school building, as well as the abatement and demolition of the existing Cutler Middle School building. The classrooms are located in a three-story building. There is a connector between the multi-story classroom building and the Admin/Assembly one-story building. The project includes the construction of a cafeteria, media center, new kitchen/servery and full-size gymnasium. Major sitework consists of all new underground utility services, parking lots and drives and the construction of one playing field. Also required is the installation of geopiers to provide soil stability. Work is scheduled to start Spring 2020 and be complete early Summer 2021. The existing Cutler Middle School will be abated and demolished beginning in Summer 2020. For questions regarding Addenda, or to confirm the bid date, contact: Mark Carroll at O&G Industries, Inc. (860) 496-4233 or email markcarroll@ogind.com. Specific questions regarding bidding procedures, project scope and site visits may be directed to Robert Vazquez at O&G Industries, Inc. (860) 452-6688 or email robvazquez@ogind.com. Bidders on bid packages so identified above are required to submit their DAS Update (Bid) Statement with the bid, as noted hereafter. This project is being performed under the Construction Management form of construction. With respect to this project, the Construction Manager is the representative of the Owner. The Owner shall approve the award of all trade contracts. Each Trade Contractor's contract shall be with the Construction Manager. The Owner, Town of Groton, has contracted with O&G Industries to serve as the Construction Manager (CM). No oral, telephone or telegraphic proposals will be considered. All bids shall stand available for acceptance for a period of ninety (90) days from the date proposals are received. No bid shall be accepted from any person/company who is in arrears to the Owner upon debt, or contract, or who is a defaulter as surety or otherwise upon obligations to the Owner. The Owner and/or Construction Manager reserves the right to require, prior to Notice of Award, a statement of facts in detail of the business and technical organization and plant of the bidder available for the contemplated work, including financial resources, present commitments, and experience of the bidder in performance of comparable work. Bid Security, Payment and Performance Bonds will be required for all trade packages with the exception of Trade Packages 2.07f - Firestopping and 2.12 - Window Treatments. In accordance with Sections 4a-60g and 4a-60h Conn. Gen. Stat., as revised, the contractors shall note the CHRO MWBE Set-aside Program Requirements and Small/Minority Business participation requirements (25% SBE and 6.25% M/WBE) as indicated above for each trade package and are responsible for ensuring that they, and the SBE/MWBE's they have selected, are eligible contractors and that they meet State of Connecticut requirements. CHRO Project Requirements - refer to Table above, trade contractors working on this project shall utilize State of Connecticut Supplier Diversity program certified Small Business Enterprises (SBE) and Minority Business Enterprises (MBE) for the minimum as stated above. For those trade contractors with goals indicated, the contractors shall provide documentation of their good faith efforts

Bid Results

Educational

$1,959,328.00

Public - City

Asbestos Abatement, Demolition, New Construction, Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
107
Bidding Soon
2,684
All Active Projects
1,036
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2020

April 6, 2020

img_map_placeholder

160 Fishtown Rd, Mystic, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.