BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Callahan, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of May 23, 2023, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to FY 2023. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Professional Liability Insurance : $1,000,000.00 SR115 from Soutel Drive to Nassau County Line TRC Members (Subject to Change) : Craig Teal Eric Shimer Renee Brinkley When submitting LOR, include Financial Management (FM) number 445340-1-32-01 and firm name on the subject line. Multi Project Advertisement The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. The number one ranked firm will have the choice of project. The Letter of Response and interviews will be based on FIN 445340-1-32-01. 445340-1-32-01: SR115 from US1 to SR202 (Butler Blvd.) Estimated contract amount is $879,673.00 The project manager is Peter Osborne. 437320-1-32-01: SR115 from Soutel Drive to Nassau County Line. Estimated contract amount is $1,465,000.00 The project manager is Clint McCraw Technical Review Committee Meeting 1 Date/Time 3/17/2020 12:30 am Shortlist Selection Date/Time 3/23/2020 07:30 pm Technical Review Committee Meeting 2 Date/Time 4/07/2020 07:30 pm Technical Review Committee Meeting 3 Date/Time 4/14/2020 12:30 am Final Selection Date/Time 4/27/2020 07:30 pm Negotiations Period Begin Date 4/30/2020 Negotiations Period Ending Date 7/07/2020 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR115 from Soutel Drive to Nassau County Line

Conceptual

Roads / Highways

$19,163,803.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
35
Bidding Soon
648
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.