BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Lincoln, Nebraska. Completed plans call for the renovation of a 9,585-square-foot, two-story above grade educational facility.

Project No. 21015 As of January 6, 2022, this project is out to bid to general contractors. Work includes the removal of the existing HVAC and electrical system and re-installation of new systems at Everett Elementary School. The project will occur with students in the school, and as such will have multiple phases as the systems are removed. All bids must be on the LPS bid form. Bid Security in the form of a Bid Bond is required. Cashier s check or certified check is not acceptable. Contact Bryce Stamp at (402) 476-1273 for additional bid information. The primary scope of the project is for Indoor Air Quality improvements. This work consists of removal of the existing HVAC systems and installation of a new ground source heat pump-based system. In addition, work will include major upgrades to the electrical system--new service entrance, transformer, emergency generator, and new light fixtures in the entire building. 2. The General Construction work includes miscellaneous demolition for new duct and utility pathways, new windows, and construction of new restrooms in existing space. The work also includes modifications to an existing fan room at the roof of the building. The work also includes miscellaneous classroom renovations. 3. Site work includes, new sidewalk paving and other improvements, construction of a new parking lot along B Street, and miscellaneous repairs and replacement of walks and steps around the building. Sitework also involves a new turf playfield and basketball court. 4. BIM Execution. The General Contractor, and all sub-contractors under him, shall be responsible for following the BIM Modelling requirements as set forth in section 011010. Please note that these requirements will be deleted from the base bid under alternate #1. Work includes the removal of the existing HVAC and electrical system and re-installation of new systems at Everett Elementary School. The project will occur with students in the school, and as such will have multiple phases as the systems are removed throughout the facility.

Award

Educational

$15,735,000.00

Public - City

Renovation

150

34

26

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
85
Bidding Soon
863
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

March 28, 2022

Project location map

1123 C St, Lincoln, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.