BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to a mixed-use development in Grimes, Iowa. Completed plans call for the addition of a 18,597-square-foot, two-story above grade educational facility; for the renovation of a 15,841-square-foot educational facility; and for site work for a educational facility.

The Board of Education of the Dallas Center-Grimes Community School District, will receive sealed bids for construction of additions consisting of a one and two-story buildings of masonry and steel construction totaling approximately 18,597 square feet, interior renovation work totaling approximately 15,841 square feet, and associated site work. The Owner requires that Project be started on, and Substantially Complete in Phases, as follows: Phase I: Construction Start Date: Immediately following execution of Agreement and Owner receipt and approval of required bonds and insurance. Substantial Completion Date: On or before the 12 day of March, 2021. th Phase I-A: Construction Start Date: Immediately following execution of Agreement and Owner receipt and approval of required bonds and insurance. Substantial Completion Date: On or before the 2 day of August, 2021. nd Phase II: Construction Start Date: On or after the 4 day of June, 2020. th Substantial Completion Date: On or before the 3 day of August, 2020. rd Phase III: Construction Start Date: On or after the 12 day of March, 2021. th Substantial Completion Date: On or before the 2 day of August, 2021. nd Phase IV: Construction Start Date: On or after the 1 day of June, 2021. st Substantial Completion Date: On or before the 2 day of August, 2021. Bidders will be required to provide security deposit in the form of a Bid Bond excecuted by a corporation authorized to contract as surety in the State of Iowa, cashiers or certified check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States, or certified share draft drawn on a credit unit in Iowa or chartered under the laws of the United States of a sum not less than 5 percent of the Base Price/Sum. The bid security should be made payable to the Dallas Center-Grimes Community School District. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the District as damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the District insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. The successful Bidder will be required to furnish a Certificate of Insurance and Performance and Labor and Material Payment Bonds both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. The Board of Education reserves the right to accept or reject any or all Bids, or any part thereof, and to waive informalities or irregularities allowed by law and to enter into such Contract or Contracts as may be deemed in the best interests of the Dallas CenterGrimes Community School District. Plans and specifications governing the construction of the proposed improvements, and also the prior proceedings of the Board of Education referring to and defining said proposed improvements are hereby made a part of this notice and the proposed contract by reference The Project which is located at 1400 Vine Street, Dallas Center, IA 50063 involved the construction activities as required by the contract documents which shall include: Grading of site, construction of one and two-story building additions, renovation of existing building areas, and site Work.

Award

Educational

$6,157,000.00

Public - City

Addition, Renovation, Site Work

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
38
Bidding Soon
577
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2020

May 25, 2020

img_map_placeholder

Multiple Locations, Grimes, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.