BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2020 at 8:00 PM

Updated February 13, 2024

Renovation of an educational facility in Santa Clarita, California. Completed plans call for the renovation of a educational facility.

For Santa Clarita ES Roof Replacement The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Work as more specifically described in the Contract Documents. The work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction and applicable regulations, and includes The removal and disposal of existing roof system and replacement with 80 mil thermal plastic (PVC) feltback membrane If any error, omission, ambiguity, or conflict in the Plans or Specifications is discovered, Contractor is required to notify the District Representative (Lori Rubenstein, Director of Project Management, lrubenstein@saugususd.org) for written clarification such that it is received no later than March 19, 2020 - 9:00 AM. Indicate the Project and Bid number in your request for clarification. Contractors are directed to not contact any other person with inquiries regarding this bid. To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors' license(s): A, B, or C-39 A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the Saugus Union School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall also be required to furnish a 100% Performance Bond and a 100% Payment Bond, Builder's Risk Insurance if it is awarded the contract for the Work.

Occupancy

Educational

$25,625.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
272
Bidding Soon
3,739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2020

May 20, 2020

Project location map

27177 Seco Canyon Rd, Santa Clarita, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.