BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a playground / park / athletic field in Toronto, Ontario. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

As part of the redevelopment of the property at 587 Yonge St by Cresford Developments improvements to James Canning Gardens were secured by the City of Toronto. The owner found that an opportunity existed to address and strengthen the entire linear park system. The scope of work includes upgrades to Norman Jewison Park, George Hislop Park, Moss Park Creek. The scope included preservation of mature honey locust trees on-site. Seven custom illuminated Corten Steel archways, standing 4.5 m tall, extend through the park, providing a warm level of lighting, clear site lines, and a distinct sense of place. The striking features take inspiration from the 1950s construction of the Yonge Street subway line that lies directly below the park system. The playground was relocated to a more visible and prominent area in the park and is comprised of a porous surface, elevated above the tree roots. New play elements include accessible play structures, balance features, and a large climbing structure. Custom precast concrete stools of varying heights and configurations were created working with a local fabricator. Spaced throughout the park, the playful stools offer casual spots to enjoy a coffee and discussion with a friend. Custom circular raised planters made of Corten Steel are filled with a variety of hardy perennials and spring bulbs that add seasonal colour and texture. The team also worked with the City of Toronto Transportation Department to provide a vegetated boulevard bump-out that extends into the road, slowing down vehicles and allowing for a shorter pedestrian crossing. As a piece of green infrastructure, the bump-out is designed to collect stormwater from the sidewalk and road. TIMELINE: Public meetings were held February 2021. Design was completed early 2021. Tenders will be issued late spring/early summer, 2021. Construction was completed summer, 2021.

Under Construction

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
122
Bidding Soon
2,495
All Active Projects
1,022
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2021

img_map_placeholder

15 Gloucester St, Toronto, ON

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.