BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in West Milwaukee, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 30, 2022, an engineer has been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: This modernization project is a 1.3 mile of reconstruction in urban environment. This 1.3 mile reconstruction is from Edgewood Ave to Kensington Blvd on STH 32 in the Village of Shorewood. Roadway reconstruction in urban environment to include full pavement removal, common excavation, base aggregate, concrete pavement, etc. Also, to include full survey, potential real estate acquisition with plat for curb ramps replacement, environmental document to be ER and perform necessary all agencies coordination Anticipated Construction Cost $5,000,000-$5,999,999 The contract price will be based on the selected consultants actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Do not include any information that meets the definition of trade secret as that term is defined in s. 134.90(1)(c), Wis. Stats. Interview No Solicitation No. SE-09 Project : EDGEWOOD AVE TO KENSINGTON BLVD County : Milwaukee WisDOT - RFQ Engineering - Roadway Reconstruction As of June 21, 2021, this project is currently under evaluation stage. A notice to intent A notice of intent to award a design firm has not been scheduled. A construction timeline has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Roads / Highways

$6,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
110
Bidding Soon
2,642
All Active Projects
982
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 1, 2022

December 1, 2024

img_map_placeholder

S 32nd St, West Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.