Published May 22, 2020 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to an educational facility in Arlington, Texas. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for the renovation of a educational facility.

**Pending approval of the CSP, work on this project will begin in the spring of 2020 with final completion expected in the summer of 2021. Arlington Independent School District ("Arlington ISD", "the District" or "AISD") will engage a single qualified general contractor to provide Construction Services, in accordance with the terms, conditions, and requirements set forth in this Request for Competitive Sealed Proposal (RCSP). Work of this Contract comprises general addition and renovation construction, including 24 mechanical and electrical, of the Arlington ISD Foodservice Center, located at 1206 W. 25 Arkansas Lane, Arlington TX, 76013, for the Arlington Independent School District, Owner. Firms ("respondents", "proposers") desiring to participate in this RCSP process shall respond with a sealed Competitive Sealed Proposal (CSP) and submit in accordance with the instructions contained in this RCSP. Only one CSP submittal will be accepted per firm, either as a single prime firm or as part of a joint venture. CSP's will be publicly opened. PLEASE NOTE: Late CSP's will NOT be accepted. It is the desire of the Owner that the successful firms have a physical presence within the D/FW Metroplex area. Community contact, design reviews, interaction with local governmental authorities having jurisdiction, construction observation, and other requirements of the required scope of services will require daily physical presence during various phases of the work, which would be difficult to perform from a remote location or on an intermittent schedule. Should any firm not intend to locate within the D/FW Metroplex, this must be clearly stated within the CSP. An explanation of how the needs of the project as described in the Scope of Work can be fulfilled from the office used must be included in the CSP. The CSP submission must include one (1) original with original signatures (Marked "ORIGINAL") and seven (7) printed copies of the CSP, plus one electronic copy in Portable Digital Format (PDF) stored on thumb drive and, must be submitted by the due date to be considered. The thumb drive should be clearly marked as to its contents. Late CSP's will be returned to Firms ("respondents", "proposers") unopened. CSP's may be withdrawn at any time prior to the due date and time shown above. CSP may not be altered, amended or withdrawn after the due date and time without the recommendation and approval of the AISD Purchasing Director. All questions regarding this CSP shall be in writing and directed to Purchasing, you may email them to tcraig1@aisd.net. Please put "20-36 Question" in the subject line. The Arlington ISD requests that all respondents restrict communications with District officials other than Purchasing, during this process. Requests for explanations or clarifications must be emailed to Tammy Craig within March 17, 2020, Purchasing Director, at tcraig1@aisd.net. Please put "CSP# Question" in the subject line.

Award

Educational

$7,848,622.00

Public - County

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Unit Prices, Alternates, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Fabricator Qualifications, Installer Qualifications, Field Samples, Quality Control, Field Quality Control Procedures, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Veneer Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Membrane Roofing, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing, Fire and Smoke Protection, Firestopping, Fire-Resistant Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Loading Dock Equipment, Foodservice Equipment, Food Dispensing Equipment, Bar Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Trenching and Backfilling, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Shoring and Underpinning, Excavation Support and Protection, Slurry Walls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Utility Transformers
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Roadway Construction
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
80
Bidding Soon
3,287
All Active Projects
1,259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2020

April 23, 2020

img_map_placeholder

1206 W Arkansas Ln, Arlington, TX


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Food Service Center - Addition and Renovation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.