BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.

Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a CM at Risk contract are sought from prospective General Contractors for the following work: The Luskin School of Public Affairs Building is a 200,000 gross-square-foot (gsf) academic building comprised of a six-floor main tower (161,500 gsf) and a two-floor addition to the south which houses data center space (22,200 gsf) and the Arts Library (16,000 gsf). The primary construction of the building is steel with concrete shear walls. The Project consists of providing seismic corrections to the Public Affairs building. Mandatory code corrections triggered by the structural work include disabled access upgrades and fire/life safety improvements. Work shall include: 1. Selective structural strengthening at beams and shear walls with shotcrete, fiber reinforced polymer (FRP), viscous dampers and installation of drag-grade beams. 2. Disabled access upgrades to existing door hardware, toilet room facilities and water fountains including accessibility upgrades along the path of travel as required by code. 3. Repair of waterproof roof membrane where damaged by project scope. 4. Removal of exterior finishes impacted by structural work and replacement in-kind. 5. Removal of interior finishes impacted by structural work and replacement in-kind. PREQUALIFICATION SCHEDULE: On March 4, 2020, prequalification documents will be available to intending bidders will be issued at no cost at: Contracts Administration University of California, Los Angeles 1060 Veteran Avenue, Suite 125 Box 951395 Los Angeles, California 90095-1395 310-825-7015 6. Modifications to architectural elements impacted by structural work, including windows, brick facade, etc. 7. Hazardous material abatement. 8. Work sequencing and phasing. 9. Preconstruction services. The buildings will remain occupied and operational during construction and coordination and staging of occupants shall be required. All work will be sequenced and phased with the performance of disruptive work occurring during off-hours. The University reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received.

Award

Educational

$2,667,457.00

Public - State/Provincial

Renovation

572

44

8

3

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
117
Bidding Soon
2,142
All Active Projects
989
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2020

November 3, 2020

img_map_placeholder

337 Charles E Young Dr E, Los Angeles, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.