Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Mather, California. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.
Interior renovation with new interior walls, doors, door hardware, ceilings, restrooms and finishes in existing building. Project includes removal and installation of parking lot striping and wheel stops and removal of curbs and equipment at former drive-through teller islands. Bidders and protected subcontractors must be prequalified with CDB; allow 45 days for application processing. Single Prime Delivery Method: Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction, Article 00 21 05. MBE/FBE/VBE. MBE/FBE/VBE firms must be certified or registered with CMS as an MBE, FBE, or VBE prior to bidding. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act(820 ILCS 130/1-12). Registration with the Illinois Procurement Gateway (IPG). Vendors may pre-register with the IPG and receive a vendor registration number. The IPG is a web based system that serves as the primary location for entering, organizing, and reviewing vendor information. The IPG allows prospective vendors to provide disclosures, registrations, and other documentation needed to do business with the State in advance of any particular procurement. Registration in the Illinois Procurement Gateway is optional. Certifications and Disclosures. Vendors must have an approved Illinois Procurement Gateway registration number and completed Form B, or submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, be registered with the Illinois Procurement Gateway, will result in rejection of bid. Subcontractors. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $50,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. Supplement to SDC. Bidders are advised to review Article 01 11 01, Supplement to SDC, for any revisions to the Standard Documents for Construction. Progress Payments. Progress payments will normally be issued by the Illinois Comptroller within 30 business days after CDB receives and approves an Invoice-Voucher. For Single Prime Delivery Method Projects: Any reference in the Specifications and the Drawings for Multiple Prime Trades shall be considered as the Prime Bidding Trade. Bid Protest. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 1400.4005. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest. To reach the Protest Review Office: The MBE/WBE goal for this contract is (10) percent ofthe amount ofthe contract awarded by CDB. The VBE goal for this contract is (ZERO) percent ofthe amount ofthe contract awarded by CDB. The Contractor shall complete all work through Substantial Completion (as defined in documents attached hereto and incorporated herein) within 120 consecutive calendar days from the date of this Agreement, and shall complete all remaining work in accordance with this Agreement ("Final Acceptance") within 21 consecutive calendar days from the date of Substantial Completion
Award
Educational
$1,847,842.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2020
July 31, 2020
10170 Missile Way, Mather, CA
Related To This Project
Mather, CA
Bid Date: Feb 09 2024
Mather, CA
Bid Date: Aug 19 2024
Mather, CA
Bid Date: Apr 26 2024
Mather, CA
Bid Date: Apr 19 2024
Mather, CA
Bid Date: May 27 2024
Mather, CA
Bid Date: Jul 09 2024
Mather, CA
Bid Date: Jul 02 2024
Mather, CA
Bid Date: Feb 07 2022
Mather, CA
Bid Date: Feb 22 2022
Mather, CA
Bid Date: Oct 18 2018
Mather, CA
Bid Date: Dec 09 2021
Mather, CA
Bid Date: Mar 24 2023
Mather, CA
Bid Date: Jun 25 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.