Site work for a water / sewer project in Walpole, Massachusetts. Completed plans call for site work for a water / sewer project.
2020 Sewer System Improvements. The work includes construction of approx: 635 vt ft cementitious lining of manholes; 21,070 lin ft of cleaning, inspection, testing and sealing of sewers; 7,750 lin ft CIPP; 100 lin ft CIP short liners; lateral liners; test and grout 58 lateral connections; cut intruding laterals; open cut point repair; wye replacement; 24,350 lin ft cleaning and inspection of sewers; topside manhole inspection of 180 manholes; and other related tasks. W&S Project No.: 2190148 The scope of work for Base Bid includes construction of approximately: 635 vertical feet of cementitious lining of manholes; 10,450 linear feet of cleaning, inspection, testing and sealing of sewers; 6,120 linear feet of cured-in-place pipe; 72 linear feet of curedin-place short liners; two lateral liners; testing and grouting of 31 lateral connections; cutting of one intruding lateral; and other related tasks. The Base Bid contract completion period is 95 consecutive calendar days. The Contractor shall complete retest inspection within 15 consecutive calendar days of commencement of retest inspection. The scope of work for Alternate Bid No. 1 includes construction of approximately: 10,620 linear feet of cleaning, inspection, testing and sealing of sewers; 1,630 linear feet of cured-in-place pipe; 28 linear feet of cured-in-place short liners; one lateral liner; testing and grouting of 27 lateral connections; cutting of four intruding laterals; open cut point repair in one location; wye replacement in one location; and other related tasks. The Base Bid plus Alternate Bid No. 1 contract completion period is 140 consecutive calendar days. The Contractor shall complete retest inspection and final paving within 20 consecutive calendar days of commencement of retest inspection. The scope of work for Alternate Bid No. 2 includes construction of approximately: 24,350 linear feet of cleaning and inspection of sewers; topside manhole inspection of 180 manholes; and other related tasks. The Base Bid plus Alternate Bid No. 2 contract completion period is 110 consecutive calendar days. The Contractor shall complete retest inspection and within 15 consecutive calendar days of commencement of retest inspection. The Base Bid plus Alternate Bid No. 1 plus Alternate Bid No. 2 contract completion period is 150 consecutive calendar days. The Contractor shall complete retest inspection and final paving within20 consecutive calendar days of commencement of retest inspection.
Award
Water / Sewer
$517,290.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2020
June 1, 2020
Multiple Locations, Walpole, MA
Related To This Project
Walpole, MA
Bid Date: Nov 29 2023
Walpole, MA
Bid Date: Nov 12 2021
Walpole, MA
Bid Date: Mar 10 2022
Walpole, MA
Bid Date: Feb 11 2022
Walpole, MA
Bid Date: Feb 11 2022
Walpole, MA
Bid Date: Mar 22 2022
Walpole, MA
Bid Date: Jul 06 2023
Walpole, MA
Bid Date: Jul 06 2023
Walpole, MA
Bid Date: Jun 05 2023
Walpole, MA
Bid Date: Jul 08 2023
Walpole, MA
Bid Date: May 04 2023
Walpole, MA
Bid Date: Dec 22 2020
Walpole, MA
Bid Date: Apr 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.