BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2023 at 8:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Caro, Michigan. Completed plans call for site work for a water / sewer project.

**As of April 12, 2021. the project has been awarded but no other information available.** Tuscola County will be accepting bids on the installation of a new outlet pipe for the retention pond at the County Health and Human Services complex. The pond is on the North side of the entrance drive. The current discharge pipe clogs easily and may be damaged from tree roots. 1. Contractor is responsible for all needed permits, drawings and must follow all local, State and Federal codes. Contractor will need a permit from the State to work in the road right of way. 2. Contractor shall contact and work with the City of Caro DPW, specific to the catch basin at roadway. 3. Contractor shall be responsible for contacting Miss Digg before any excavation work. 4. Contractor shall remove existing drainage pipe from the retention pond to the east corner catch basin at the roadway. 5. Contractor shall prepare the trench bottom with granular soils such as coarse sand or crushed stone, compacted to provide a firm, stable and uniform support for the full length of the pipe. Ensure that the trench bottom is smooth and free of large stones, rocks, boulders, construction debris or frozen material. 6. Contractor shall install a PVC 6 inch SDR 35 drainage pipe, from the retention pond to the catch basin at roadway. 7. Pipe shall be installed following all manufactures instructions, and to allow proper drainage of the retention pond. Outlet into catch basin must meet City approval once installed. 8. Inlet side of pipe shall have a flared end installed metal or plastic is acceptable. 9. Completed area shall be mowable, and hydro seeded. 10. Contractor shall properly dispose of any extra material. 11. Contractor is responsible for all necessary construction required for a finished installation of the project. 12. Contractor is to field verify measurements before beginning work. 13. Contractor shall be insured and provide copy of liability insurance and workmens comp. 14. Contractor shall be licensed to perform the required construction. 15. Contractor is to provide all necessary materials, and equipment. 16. All work is to be completed by qualified personnel. 17. Contractor is responsible for cleaning of the job site daily. Please call if you have questions or to view the project- 989-672-3756 18. Contractor shall use all necessary safety precautions to protect the public from the work area. *This project is on hold due to the public health crisis. A new timeline has not been established.

Award

Water / Sewer

$300,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
100
Bidding Soon
1,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2021

March 22, 2021

Project location map

To Be Determined, Caro, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.