Demolition, site work, renovation and addition to a mixed-use development in Whitehall, New York. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Separate Bids are requested for the following Contracts:Roofing In accordance with the Drawings, Project Manual (including Conditions of the Contract and Specifications), and other Bidding and Contract Documents prepared by: Tetra Tech Engineers, Architects & Landscape Architects, P.C. d/b/a Tetra Tech Architects & Engineers 10 Brown Road Ithaca, New York 14850 Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as a registered plan holder. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. All bid addenda will be transmitted to registered plan holders, regardless of receiving electronic or hard copy Bid Documents, via email The anticipated date of SED Approval is March 16, 2020. Once the scanned copy of the executed deposit check is received, Bidding Documents will be shipped. Mail checks to Lohrius Blueprint, 226 Newtown Road, Plainview, New York 11803. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs (either by providing FedEX/UPS account number or being charged a flat rate by the printer). Registered plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with REV for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. As bid security, each Bid shall be accompanied by a certified check or Bid Bond made payable to the Owner, in accordance with the amounts and terms described in the Instructions to Bidders. The Owner requires Bids comply with bidding requirements indicated in the Instructions to Bidders. The Owner may, at its discretion, waive informalities in Bids, but is not obligated to do so, nor does it represent that it will do so. The Owner also reserves the right to reject any and all Bids. The Owner will not waive informalities which would give one Bidder substantial advantage or benefit not enjoyed by all affected Bidders. Bids may not be withdrawn before 45 days following the Bid opening thereof, unless an error is claimed by the Bidder in accordance with the Instructions to Bidders. Plan deposit is refundable in accordance with the terms of the Information For Bidders to all submitting bids. Bidding Document costs are refundable provided the documents are returned to REVplans within thirty (30) days of the Bid Opening, and are in Complete, unmarked and Not Torn condition. Any bidder requiring printed documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. When ordering, please provide the following information: Company Name Contact Name Shipping Address Phone Number Fax Number E-mail Address Shipper Account Number (UPS or FedEx) Bid Results GENERAL WORK Gallo Construction Corporation :- $4,039,800 MECHANICAL WORK Campito Plumbing & Heating :- $1,939,000 ELECTRICAL WORK LaCorte Companies, Inc :- $289,618 PLUMBING WORK Tri Valley Plumbing & Heating :- $337,400 SITE WORK Edward & Thomas O'Connor :- $2,039,000 ROOFING WORK General Roofing Contractors, LLC :- $1,073,026

Award

Educational

$1,073,026.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Alternates, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Healthcare Equipment, Therapy Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment, Fire Suppression Systems Insulation, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water, Underground Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Potable-Water Storage Tanks, Facility Sanitary Sewerage, Sanitary Sewerage Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems, Swimming Pool Pumps, Fountain Plumbing Systems, Fountain Pumps, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Facility Fuel Systems, Facility Fuel-Storage Tanks, Facility Underground Fuel-Oil, Storage Tanks, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Cooling Equipment, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Radiators, Convectors
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Central Dimming Controls, Modular Dimming Controls, Network Lighting Controls, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Retaining Walls, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Fuel Distribution Utilities, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks, Electrical Utilities, Utility Substations, Utility Transformers, Site Grounding, Site Lightning Protection
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
89
Bidding Soon
997
All Active Projects
420
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2020

June 29, 2020

img_map_placeholder

Buckley Rd, Whitehall, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Addition and Alterations to Whitehall Elementary School and Reconstruction to Whitehall Junior/Senior High School - Roofing Contract

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.