BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Conley, Georgia. Completed plans call for the construction of a laboratory facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; water / sewer project; and laboratory facility.

As of November 1st, 2024 this project is still pending an award decision. SCOPE OF WORK Construct a Forensic Laboratory. Primary facilities include administration areas, laboratory space, facility support area, covered hardstand (mobile laboratory area), organizational vehicle parking, Intrusion Detection System (IDS) installation, mass notification system, and Utility Monitoring and Control System (UMCS) connections. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided, plus enhanced AT/FP measures. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 236 Tons). The design of the facility includes Risk Management Framework as required per DODI 8500.01 and 8510.01. The criteria include UFC 4-010-06 "Cybersecurity of Facility Related Control Systems" and ECB's 2015-14 and 2018-11 for cybersecurity measures of the following systems: a. Electronic security systems (ESS) b. Energy monitoring and control systems (EMCS) c. Supervisory control and data acquisition (SCADA) d. Industrial control systems (ICS) e. Fire and Life Safety Systems. Supporting facilities will include site development, utilities, limited back-up power source, and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping, and signage. Heating and air conditioning will be provided by self-contained system.

Bid Results

Laboratories

$136,778,000.00

Public - Federal

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
136
Bidding Soon
2,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

November 3, 2025

Project location map

4301 Moreland Ave, Conley, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.