Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 30, 2025 at 8:00 PM
Updated May 31, 2025
Site work, paving, outdoor lighting and new construction of a mixed-use development in Conley, Georgia. Completed plans call for the construction of a laboratory facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; water / sewer project; and laboratory facility.
As of November 1st, 2024 this project is still pending an award decision. SCOPE OF WORK Construct a Forensic Laboratory. Primary facilities include administration areas, laboratory space, facility support area, covered hardstand (mobile laboratory area), organizational vehicle parking, Intrusion Detection System (IDS) installation, mass notification system, and Utility Monitoring and Control System (UMCS) connections. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided, plus enhanced AT/FP measures. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 236 Tons). The design of the facility includes Risk Management Framework as required per DODI 8500.01 and 8510.01. The criteria include UFC 4-010-06 "Cybersecurity of Facility Related Control Systems" and ECB's 2015-14 and 2018-11 for cybersecurity measures of the following systems: a. Electronic security systems (ESS) b. Energy monitoring and control systems (EMCS) c. Supervisory control and data acquisition (SCADA) d. Industrial control systems (ICS) e. Fire and Life Safety Systems. Supporting facilities will include site development, utilities, limited back-up power source, and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping, and signage. Heating and air conditioning will be provided by self-contained system.
Bid Results
Laboratories
$136,778,000.00
Public - Federal
New Construction, Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2024
November 3, 2025
4301 Moreland Ave, Conley, GA
Related To This Project
Conley, GA
--
Conley, GA
Bid Date: Mar 22 2023
Sandersville, GA
Bid Date: May 10 2022
Columbus, GA
Bid Date: Mar 15 2022
Fayetteville, GA
Bid Date: Apr 11 2022
Hinesville, GA
Bid Date: Apr 13 2021
Fayetteville, GA
--
Grovetown, GA
Bid Date: Mar 03 2022
Atlanta, GA
--
Cedartown, GA
Bid Date: Dec 14 2021
Fitzgerald, GA
Bid Date: Jun 03 2021
Alpharetta, GA
Bid Date: Apr 27 2022
Douglasville, GA
--
Richmond Hill, GA
Bid Date: Apr 22 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
