BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a mixed-use development in Union Grove, Wisconsin. Working plans call for outdoor lighting for a sidewalk / parking lot; and road / highway.

In general the work consists of: Demolition and replacement of existing street and pedestrian pole lights. New pedestrian lights shall have integral motion sensors to dim lights to 50% upon no occupancy detection for maximum energy savings. This project involves the demolition of the existing street and pedestrian lights as indicated on the drawings. New street and pedestrian pole lights shall be provided to improve lighting on campus and provide enhanced security to reduce vandalism. A bid bond prepared on the Bid Bond Form bound herein, payable to the State in the amount not less than 10% of the maximum bid shall accompany each bid as a guarantee. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Due to increased COVID-19 precautionary measures, the pre-bid walk-through for this project is cancelled. As of April 15, 2020, this project will rebid at a future date. The successful Contractor must agree to commence work on or before a date to be specified in a written Notice to Proceed and to fully complete all work within 120 consecutive calendar days thereafter. Completion time will be converted to a specific date at the time the Notice to Proceed is issued. Refer also to Conditions of the Contract for Simplified Projects, Article entitled Time for Completion. In awarding construction contracts, the Department of Administration shall attempt to ensure that 5 percent of the total amount expended in each fiscal year is awarded to contractors which are minority businesses, as defined under Wis. Stat. s. 16.75(3m)(a); and shall attempt to ensure that at least 1 percent of the total amount expended each fiscal year is awarded to contractors that are disabled veteran-owned businesses. In order to assist the department in these endeavors we strongly encourage all bidders to use MBEs and DVBs.

Final Planning

Sidewalks / Parking Lot

$236,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
111
Bidding Soon
1,901
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2020

June 5, 2020

img_map_placeholder

21425 Spring St, Union Grove, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.