BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marion, Indiana. Completed plans call for site work for a water / sewer project.

Any Bid Received Later Than the stated Time Will Be Returned Unopened. No Conditional Bids Will Be Considered. The Work for Which Proposals Are to Be Received: Marion Sewer C.i.p.p.- City Wide Sewer Lining Phase 2 Project #31-20-07 the Work Consists of Cipp Lining Approxim- Ately 2,314-feet of 12" Sewer Pipe and 664- Feet of 8" Sewer Pipe, and All Appurtenances Necessary to Complete the Sewer Lining Work as Shown on the Drawings and as Specified. Proposals Shall Be Properly and Completely Ex- Ecuted on the Standard Proposal Form Obtain- Able From the Office of the Engineer, With Fully Executed Non-collusion Affidavit Required by the Statutes of the State of Indiana. Form 96, Contractors Bid for Public Works, Shall Accom- Pany All Bids as Prescribed by the Indiana State Board of Accounts. Each Proposal Shall Be Accompanied by a Certified Check Made Payable to the Marion Utility Service Board, or an Acceptable Bidder's Bond by an Incorpor- Ated Surety Company in Good Standing and Qualified to Do Business in the State of Indiana, in an Amount of Not Less Than 5% of Said Bid, Said Deposit Being for the Purpose of Ensuring the Execution of the Contract for Which Said Bid is Made. Any Proposal Not Accompanied by the Above Required Items May Be Deemed to Be a Non-responsive Bid by the Owner. No Consider- Ation for Escalation of Prices Can Be Con- Sidered, and Therefore Contractors Are Advised Not to Include Any Such Escalation Clauses in Their Proposals for This Project. The Contractor to Whom Work is Awarded Shall Be Required to Furnish a Performance Bond and a Payment Bond, Acceptable to the Marion Utility Service Board in the Amount of 100% of the Contract Price. No Bidder May Withdraw His Proposal Within a Period of 60 Days Following the Date Set for Receiving Proposals. The Utility Service Board Reserves the Right to Retain Any and All Proposals for a Period of Not More Than 90 Days, and Said Proposals Shall Remain in Full Force and Effect During Said Time. The Marion Utility Service Board Further Reserves the Right to Waive Informalities and to Award the Con- Tract to the Lowest and Most Responsible Bid- Der or Bidders, All to the Advantage of the Mari- on Utility Service Board, or to Reject All Propos- Als.

Award

Water / Sewer

$121,488.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
35
Bidding Soon
896
All Active Projects
347
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2020

May 14, 2020

img_map_placeholder

Multiple Locations, Marion, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Marion Sewer CIPP- City Wide Sewer Lining Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.