BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, remodeling and renovation of a mixed-use development in Jay, Oklahoma. Design plans call for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a playground / park / athletic field.

As of August 29, 2022, an architect and CM have been selected. JAY - Details concerning the Jay School Bond Proposition have been released. The three part proposition would affect the lower elementary, the upper elementary, the middle school, the high school, the agriculture building, the field house and the football field. Proposition 1 - New elementary cafeteria and safe room to be completed in three phases. Phase one would build a foundation and exterior partitions. Phase two would build the roof and HVAC and fixtures. Phase three would add windows, window fixtures, doors, plumbing, plumbing fixtures and additional school district equipment, fixtures and furnishings. Total cost: $3,320,000 - New wrestling room and safe room to be completed in three phases. Phase one would build a foundation and exterior partitions. Phase two would build the roof, add roofing fixtures, electrical fixtures and equipment, interior partitions and finishings. Phase three would including plumbing, plumbing fixtures, doors, windows, and additional school district equipment, fixtures and furnishings. Total cost: $3,315,000.00. - Remodeling of the high school building. This would remodel the cafeteria and restrooms, including walls, flooring, ceilings, and other interior finishes, as well as acquire additional school district furniture, fixtures and equipment. Total cost: $1,690,000.00. - Acquisition and installation of district wide technology equipment. This includes roof repairs, HVAC upgrades, remodel elementary restrooms, remodel old gym, the choir room and the band room, install new lockers at the middle school and high school, acquire new band instruments and additions school district furniture, fixtures and equipment. Total cost: $1,955,000.00. Proposition 2 - A new field house would be constructed, equipped and furnished, a eight lane track, bleachers, a press box and additional equipment and would install a natural grass football field and fencing. Total cost: $3,445,00000. Proposition 3 - Acquire student transportation equipment. Total cost: $800,000.00. Unpaid/Unfinished Bonds The Jay School District has two bonds previously approved by voters in the district. Bond 1: Purchase student transportation vehicles, pay all legal, financial and other costs relating to the issuance of bonds. This bond was elected on November 10, 2015, for the amount of $500,000. $250,000 remains to be paid off. Bond 2: Renovate and repair the existing Vo-Ag building, construct security improvements at the entrance of the upper elementary, middle school and high school, acquire and install windows at the middle school, acquire and install HVAC upgrades district-wide, construct site improvements via driveway and parking areas for the lower elementary, sidewalks and canopies for pickup areas at the upper elementary and middle school, as well as paying for all legal, financial and other costs relating to the issuance of bonds. This bond was elected on November 10, 2015, for the amount of $4,425,000.00. $3,445,000 remains to be paid off. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Educational

$12,570,000.00

Public - City

Remodeling, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
84
Bidding Soon
1,182
All Active Projects
538
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 31, 2022

img_map_placeholder

Multiple Locations, Jay, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.