Renovation of a water / sewer project in El Cajon, California. Completed plans call for the renovation of a water / sewer project.

Pump Station Improvement - a. Power distribution equipment b. Motor control centers c. Solid state reduced voltage motor controllers d. Automatic transfer switches e. Service entrance work and coordination with the Utility Company f. Short Circuit Analysis and Coordination Study g. All support material and hardware for raceway and electrical equipment h. Installation, termination & labeling of all cable i. Building wall penetrations for raceways j. Start up, acceptance testing test reports and instruction of systems operation to the District. includes wires, cables, and connectors for power, lighting, signal, control, and related systems rated 600 volts and less. Provide the labor, tools, equipment, and materials necessary to furnish and install raceways, boxes, and supporting devices Each and every Bidder should attend the Pre-Bid Conference. Prospective bidders MAY NOT visit the Project Site without making arrangements. Bids will be accepted from any bidder who did not attend the Pre-Bid Conference. Bid Opening - To listen via teleconference dial: 1 (415) 930-5321 Access Code: 576-900-151# Padre Dam Municipal Water District, hereinafter called the District, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to DISTRICT for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents The successful bidder will be required to furnish the District with a Performance Bond equal to 100% of the successful bid, and a Payment Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. The Engineer estimate for the base bid is $2,062,875. The Engineer estimate for the combined base and alternate bid is $3,200,238 The Contractor shall complete all Work required by the Contract Documents within 720 calendar days from the commencement date stated in the Notice to Proceed, hereinafter the Contract Time. By its signature hereunder, Contractor agrees the Contract Time for completion set forth above is adequate and reasonable to complete the Work. The Contractor acknowledges that the District will sustain actual damages for each and every day completion of the Project is delayed beyond the Contract Time. Because of the nature of the Project, it would be impracticable or extremely difficult to determine the Districts actual damages. Accordingly, as provided in Government Code section 53069.85, it is agreed that the Contractor will pay the District the sum of [$2500] for each and every calendar day of delay in completing the Work beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event the Liquidated Damages are not paid, the Contractor agrees the District may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not affect the District rights to other damages or remedies specified in the Contract Documents or allowed by law. Completion- 720_ calendar days

Bid Results

Water / Sewer

$1,916,488.00

Public - County

Renovation

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
137
Bidding Soon
1,760
All Active Projects
839
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 22, 2021

February 21, 2022

February 9, 2024

img_map_placeholder

Multiple Locations, El Cajon, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.