Renovation of a water / sewer project in Port Arthur, Texas. Completed plans call for the renovation of a water / sewer project.

This Project consists of major rehabilitation of the City of Port Arthur's Main Wastewater Treatment Plant (WWTP) permitted for an average daily flow of 9.2 MGD and Main Outfall Lift Station sized for a firm pumping capacity of 45 MGD. Scope of work includes the following: 1. Main Outfall Lift Station: Rehabilitation of the Main Outfall Lift Station including replacement of pumps, piping, and appurtenances; New MCC and Variable Frequency Drives (VFDs); HVAC and architectural improvements to the building; and new bypass manifold. 2. Headworks: New headworks with mechanical screens, screenings processing equipment, grit removal and grit washing and dewatering equipment. 3. Primary Clarifiers: Two (2) new 126' diameter primary clarifiers and primary sludge pumping system. 4. New vaults for flow control valves and flow meters. 5. Trickling Filters: New splitter box for trickling filters; improvements to the four (4) existing trickling filters including replacement of mechanism in all 4 trickling filters and replacement of media in 2. 6. Multipurpose Lift Station: New 45 MGD multipurpose lift station including pumps, piping, valves and other appurtenances. 7. Aeration Basins: Demolition of three (3) existing screw pumps at the aeration basins and structural improvements to the aeration basin influent channel. 8. Aeration Basin Blower Building: Replacement of three (3) existing aeration basin blowers with new multi-stage centrifugal blowers; HVAC and architectural improvements to the blower building. 9. Final Clarifiers: Replacement of mechanism in all three (3) final clarifiers; Two (2) new sludge pumping stations; new scum pump in each clarifier; three (3) new vertical turbine pumps and associated piping and valves at the 15 MGD final clarifier effluent lift station. 10. RAS/WAS Meter: New return activated sludge (RAS) and waste activated sludge (WAS) meter stations and associated piping and valves. 11. Filters: New 30 MGD filtration system and associated backwash and solids removal system. 12. Junction Box: Improvements to the existing flow junction box where final clarifier effluent and filtered effluent combine prior the chlorine contact basins. 13. Chlorine Contact Basins: New actuated weir gates, new grating, structural improvements to the chlorine contact basins; and two (2) new multi-stage centrifugal blowers. 14. Non-Potable Water (NPW) System: New non-potable water system consisting of three (3) vertical turbine pumps, two (2) self-backwashing strainers, new 5,000 gallon hydropneumatic tank, new air compressor, and new NPW distribution system. 15. Chemical Feed Building: Replacement of six (6) chlorine ton cylinder scales; two (2) new sodium bisulfite storage tanks; new skid-mounted sodium bisulfite feed pump system; HVAC and architectural improvements of the chlorine feed building. 16. Aerobic Digesters: New coarse bubble diffusers in both digesters; three (3) new positive displacement blowers and associated air piping; new thickened sludge feed pumps; HVAC and architectural improvements to the digester feed pump building. 17. Solids Dewatering System: Two (2) new screw press; three (3) new sludge pumps; new polymer feed system; and associated piping, valves and appurtenances; HVAC and architectural improvements to the building. Alternate bid includes replacement of the two (2) conveyors for the dewatered solids. 18. Administration Building: Remodeling of the administration floor plan to extend the lab room; and HVAC improvements. 19. Electrical Building: Two (2) new North and South Electrical Building to house new electrical system. 20. Generator: Addition of one (1) new 750 kW generator. 21. Overall: Yard piping and site civil improvements. 22. Demolition: Demolition and disposal of existing structures and equipment as indicated on the contract drawings. Please direct all questions related to the design of this Project to the Q&A Section. Estimate: $53,000,000.00 - $55,500,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Last Day to Post Questions December 8, 2021 The Project is to be substantially complete and ready for operation on or before 1095 days from Notice of Award of the contract. The Project is to be complete and eligible for final payment 90 days after the date for Substantial Completion. MBE (19.44%), WBE (9.71%)

Award

Water / Sewer

$67,217,338.00

Public - City

Renovation

Subscribe For Documents

161 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
81
Bidding Soon
1,209
All Active Projects
489
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 12, 2022

March 14, 2022

June 11, 2025

img_map_placeholder

6300 Procter St, Port Arthur, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.