BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023001460 Project Name: Greens Bayou Greenway - Segment GR03 Project Number: TABS2023001460 Facility Name: Greens Bayou Greenway - Segment GR03 Location Address: 9843 1/2 Green River Drive Houston, TX 77078 Location County: Harris Start Date: 5/1/2023 Completion Date: 2/1/2024 Estimated Cost: $3,400,000 Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: concrete trail, canopy structures, drainage improvements, planting Square Footage: 1,200 ft 2 ________________________________________________________________________________________________________________________________________ Scope of work includes: concrete trail, drainage structures, box culverts, site furniture, earthen access path, planting, pedestrian crossing structures, riprap, and clearing Project consists of the following major work items. Note that these quantities are an estimate for order of magnitude and general planning purposes only. Contractor is responsible for their own quantity take offs. 150 SY Concrete Pedestrian Trail 44 LF 6x6 Box Culvert 2 EA 9 Wide Pedestrian Crossings 246 CY Riprap 14,200 LF Earthen Access Path Construction in, on, or near existing roadways will require a Traffic Control Plan. Construction also requires the implementation of Storm Water Pollution Prevention Plan and features. Disposal of any excess material and debris is the responsibility of the contractor. All disturbed areas are to be sodded as indicated on plans. Estimated Construction Budget: $1,600,000.00 - $1,700,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pre-bid Meeting Video available at website.

Post-Bid

Roads / Highways

$1,700,000.00

Public - City

Paving, Site Work

113

15

2

5

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
78
Bidding Soon
2,767
All Active Projects
979
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

August 2, 2022

img_map_placeholder

Greens Bayou Greenway, Houston, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.