BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Detention Improvements to Serve Dellrose Extra Reinforcing Steel D-7 Bulldozer with operator and fuel 6-inch Diesel driven pump with fuel Extra cement stabilized sand (bedding or backfill) for sanitary sewer and storm sewer; 1-1/2 sacks/ton Additional cost for City of Houston bedding and backfill for wet sand construction on storm sewer, all sizes and depths Deep wells for dewatering 24-inch Aluminized corrugated steel pipe, includes bedding and backfill, all depths, 18" Thick concrete rip rap, includes geotextile fabric, Remove and offsite disposal of existing 24" HDPE storm sewer , all depths Clearing and grubbing, includes root raking and back dragging, and offsite disposal of cleared and grubbed material, (

Bid Results

Water / Sewer

$577,355.00

Public - County

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
141
Bidding Soon
3,797
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

August 15, 2022

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.