EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2020 at 8:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Forest Grove, Oregon. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project name is: B Street Overflow Bridge No. 459 Replacement This project will construct the following in Washington County: 1. Install and maintain temporary traffic control and detour. 2. Install erosion control. 3. Remove existing bridge. 4. Construct bridge. 5. Construct roadway widening. 6. Construct embankments. 7. Install guardrail. 8. Install permanent signing and striping. 9. Perform additional and Incidental Work as called for by the Specifications and Plans. The project includes grading, structures, paving, signing, striping, and roadside development. The Project cost range is $1,000,000 - $2,000,000 The County will not hold a pre-bid meeting for this project. A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. Bidders are solely responsible for ensuring actual receipt of the bid by Washington County DLUT. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board pursuant to ORS 701.026 prior to submitting a bid. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the county in these bid documents. Otherwise, the bid may be rejected as non-responsive. Bidders must conform to the requirements of these bid documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the ORPIN web site prior to bidding. Bidders must sign all Bid Forms, and in doing so agree to comply with the statement in the Bid Form regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit, in a sealed envelope, the First-tier Subcontractors Disclosure Form provided at the end of Part 2.0 of this Book. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). Licensing per ORS 468A.720 (working with asbestos) is not required for this project. The County reserves the right to waive any irregularities or informalities.

Award

Bridges / Tunnels

$1,082,838.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
51
Bidding Soon
752
All Active Projects
301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2020

May 22, 2020

img_map_placeholder

B St, Forest Grove, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.