EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2022 at 8:00 PM

Updated June 15, 2024

Site work for a civil project in Palm Coast, Florida. Completed plans call for site work for a water / sewer project; bridge / tunnel; and road / highway.

As of August 19, 2022, project was awarded to CPH, Inc but awarded amount is not available. Site work and paving for a mixed-use development in Palm Coast, Florida. Completed plans call for site work for a water / sewer project. The Contractorshall provide all work required including, but not limited to, labor,supervision, traffic control, materials, equipment, installation, and incidentals required. Contractor shall also provide material samples, as necessary, to ensure compliance with manufacturer's recommendations. Installation of all materials shall be in accordance with all applicable CITY standards and requirements, applicable Florida Departments of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (latest edition), manufacturer and industry preferred standards. Work assigned under this contract may include, but is not limited to, the following: Is requesting proposals from qualified vendors. This project consist of upsizing Stormwater conveyances at four (4) sites in the Quail Hollow neighborhood (K-Section) within the City of Palm Coast. Contractors will be responsible for demolition /removal of the existing Stormwater conveyances and replacing with Concrete Box Culverts (CBC's) according to site-specific construction plans; and all other incidental work necessary to provide a completed project in accordance with the contract documents. Total construction time to achieve Substantial Completion at each site is forty-five (45) consecutive calendar days from the date of the "Notice to Proceed," with an additional fifteen (15) consecutive calendar days to achieve Final Completion Allsubmittals will be evaluated by City staff in accordance with the criteria set forth in the bid documents. It is the intent of The City to award each culvert crossing as its own stand-alone project to the corresponding lowest bid. The City reservesthe right to reject all bids/submittals, and to solicit and re-advertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award. All prospective Bidders are hereby instructed not to contact any member of the City of Palm Coast City Council, City Manager, or City of Palm Coaststaff members other than the noted contact person(s) regarding this bid/request at any time prior to the bid/request having been formally presented to, and voted on by, the City Council. Any such contact shall be cause for rejection of your bid/request submittal. Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through the City's Procurement Portal QUESTION DEADLINE: July 28, 2022 at 2:00 PM A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time. In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. Allsubmittals will be evaluated by City staff in accordance with the criteria set forth in the bid documents. The City reserves the right to reject all bids/submittals, and to solicit and re-advertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award. Intent to Bid Due Date: Aug 10th 2022, 2:00 PM EDT

Award

Water / Sewer

$30,000,000.00

Public - City

Site Work

58

11

66

8

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
71
Bidding Soon
1,252
All Active Projects
524
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

October 11, 2022

img_map_placeholder

Multiple Locations, Palm Coast, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.