BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2020 at 8:00 PM

Updated September 14, 2023

Site work for a development in Cheyenne, Wyoming. Completed plans call for site work for a development.

The Project involves alluvial and air rotary drilling and the injection of low to high-mobility grout into mine voids, workings, and rubblized zones as needed. In addition, exploratory drilling, coring as needed, hole backfilling, and surface restoration work will be performed in conjunction with the work.Drilling for the injection of grout will entail drilling; vertical 4-inch minimum diameter boreholes to a maximum vertical depth of 80 feet. The work on this project is anticipated to begin in July, 2020.

Award

Conservation and Development

$2,542,016.00

Public - State/Provincial

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
49
Bidding Soon
682
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2020

July 14, 2020

Project location map

Multiple Locations, Cheyenne, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.