BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and remodeling of a mixed-use development in Marshalltown, Iowa. Completed plans call civil work for a transportation facility.

https://www.1230kfjb.com/2021/10/26/airport-delays-in-marshalltown/ _The Marshalltown Airport was the focal point of discussion last night for the Marshalltown City Council. Part of that discussion also is an illustration of the issues that come about when supply lines are backed up as much as they are now. Garling Construction, the contractor for the building of the new hangar, will not be able to complete the job by the end of the month, due to those supply chain issues. It is asking for a time delay and monetary assistant from the city to help make it whole. Public Works Director Justin Nickel told the Council the delay was one thing, the cost is another. The Council instructed staff to come back with a recommendation in two weeks on how to proceed on Garling's request.____________________________________ Bid Package No.1 - Bid Package No.1 shall cover all work related to the construction of a 100' x 120' hangar as indicated in project manual and project plans. Work related to this bid package shall be the Pre-Engineered Steel Hangar Building, Insulation, Liner Panel, Floor, Subbase and other items shown in the hangar, except for the construction of the walls and roof of the vestibule, electrical and mechanical rooms in the hangar building envelope, which shall be part of Bid Package No.2. In addition the terminal building power panel, the electrical and mechanical improvements in the vestibule in the hangar building envelop; water heater located in the mechanical room; and inverter for emergency lighting located in the electrical room shall be part of Bid Package No. 2. Bid Package No.2 - Bid Package No.2 shall cover all work related to the construction of a terminal building and site improvements as indicated in project manual and project plans. Work related to this bid package shall be the Pre-Engineered Steel Terminal Building, Interior Finishes, Floor, Subbase, Electrical, Mechanical and Plumbing contained within the terminal building envelope and other items not associated with the Hangar Improvements. Construction of the walls and roof of the vestibule, electrical and mechanical rooms in the hangar building envelope shall be a part of this bid package. In addition the terminal building power panel, the electrical and mechanical improvements in the vestibule in the hangar building envelop; water heater located in the mechanical room; and inverter for emergency lighting located in the electrical room shall also be a part of this bid package.

Under Construction

Transportation Terminals

$200,000.00

Public - Federal

Remodeling, Site Work

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
55
Bidding Soon
1,128
All Active Projects
397
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 14, 2020

August 3, 2020

October 30, 2021

img_map_placeholder

2651 170th St, Marshalltown, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.