BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2020 at 7:00 PM

Updated September 15, 2023

Site work, paving and new construction of a civil project in Miami, Florida. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 11 - Grading (includes clearing and grubbing, excavation, and embarkment). 15 - Hot plant-Mixed Bitum. Course (incl structural & surface ...) 17 - Intermediate SR-90/US HWY-41/tamiami Trail From S-333 to S-334 The Project is located in western Miami-Dade County, Florida and situated within Township 54 South and Range 37 East, traversing through unincorporated Miami-Dade County. Within the Project limits, SR 90/Tamiami Trail is an east-west undivided rural arterial with design speed of 60 mph and posted speed of 55 mph, consisting of 12-foot wide travel lanes, and 10-foot wide outside shoulders (5-foot paved). The overall purpose of this project is Everglades restoration. Specifically, the Congressionally authorized purpose is "to restore more natural flow to ENP and Florida Bay, restoring habitat within the Park and ecological connectivity between the Park and the Water Conservation Areas." The project includes the reconstruction of the existing two-lane roadway and shoulders within the project limits from MP 13.85 to MP 24.42. The project includes realigning and raising the profile of the existing roadway approximately two feet, placement of geotextiles for roadway and base reinforcement, utility coordination, construction of 8 drainage culverts, 6 bridges, construction of drainage swales and harmonizing the proposed roadway to adjacent properties and canals within the project limits. As of November 12, 2020, a design/build firm has been selected. The project is currently in the design stage and a firm construction timeline has yet to be announced.

Award

Bridges / Tunnels

$53,225,457.00

Public - State/Provincial

New Construction, Paving, Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
137
Bidding Soon
1,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.