Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Miami, Florida. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 11 - Grading (includes clearing and grubbing, excavation, and embarkment). 15 - Hot plant-Mixed Bitum. Course (incl structural & surface ...) 17 - Intermediate SR-90/US HWY-41/tamiami Trail From S-333 to S-334 The Project is located in western Miami-Dade County, Florida and situated within Township 54 South and Range 37 East, traversing through unincorporated Miami-Dade County. Within the Project limits, SR 90/Tamiami Trail is an east-west undivided rural arterial with design speed of 60 mph and posted speed of 55 mph, consisting of 12-foot wide travel lanes, and 10-foot wide outside shoulders (5-foot paved). The overall purpose of this project is Everglades restoration. Specifically, the Congressionally authorized purpose is "to restore more natural flow to ENP and Florida Bay, restoring habitat within the Park and ecological connectivity between the Park and the Water Conservation Areas." The project includes the reconstruction of the existing two-lane roadway and shoulders within the project limits from MP 13.85 to MP 24.42. The project includes realigning and raising the profile of the existing roadway approximately two feet, placement of geotextiles for roadway and base reinforcement, utility coordination, construction of 8 drainage culverts, 6 bridges, construction of drainage swales and harmonizing the proposed roadway to adjacent properties and canals within the project limits. As of November 12, 2020, a design/build firm has been selected. The project is currently in the design stage and a firm construction timeline has yet to be announced.
Award
Bridges / Tunnels
$53,225,457.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2020
April 1, 2021
FL-90, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Dec 05 2016
Miami, FL
Bid Date: Aug 19 2022
Miami, FL
Bid Date: Sep 07 2022
Miami, FL
Bid Date: Mar 22 2022
Miami, FL
Bid Date: Sep 16 2020
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Aug 11 2022
Miami, FL
--
Miami, FL
Bid Date: Feb 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.