BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Stockton, California. Completed plans call for the renovation of a transportation facility.

As of February 5 2021 project was not yet been awarded. No estimated time frame yet. If you have any further questions, please contact MaryEllen Chavez at 209-468-4702 or by email at mechavez2@sjgov.org. Certain portions of the RFQ documents contain Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with the written permission of the Administrator of the Transportation Security Administration or the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. The proposed scope of work shall consist of the following and is subject to change: 1. Replace the existing computerized card access control system, including server, workstations, field panels, controllers, and card readers. 2. Maintain the HID Corporate 1000 unique coded credential for use with the new card readers. 3. Upgrade existing airport identification (ID) badging and fingerprint systems to be compatible with new access control and management system. 4. Add additional access control at Security Identification Display Area (SIDA) doors in compliance with TSA 49 CFR, Part 1542 Airport Security requirements. 5. Replace access control at six (6) existing vehicle gates and two (2) pedestrian gates. 6. Replace the existing video surveillance and recording system with a new system fully compatible and integrated with the new access control and management system as a unified platform made by a single manufacturer. All cameras shall be recorded all the time for thirty (30) days. a. Per California Government Code 26202.6, video recordings of alarms and activity must be saved for up to one (1) year. 7. Provide video display capability at the Airport Operations Manager's Office and at the Security and Badging Office. 8. Replace existing video surveillance cameras. 9. Add new video surveillance cameras. 10. Provide a new dedicated network for the new security systems consisting of both hardwired and wireless links. 11. Modify existing electrical systems to accommodate the proposed technology upgrades. a. Reuse existing electrical service to serve the new gate operator and new access control panel at gates. The typical modification will consist of 1) the provision of a safety switch that controls all power to each gate and 2) the installation of new gate pedestal framework for the mounting of gate related equipment. b. Extend new service from existing panels using mini power zones.

Post-Bid

Transportation Terminals

$2,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
188
Bidding Soon
3,510
All Active Projects
1,441
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2020

December 31, 2020

img_map_placeholder

5000 S Airport Way, Stockton, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.