BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and renovation of a mixed-use development in Cupertino, California. Completed plans call for site work for a playground / park / athletic field; for the renovation of a playground / park / athletic field; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The estimated construction cost is $3,950,000.00. The Project must be fully completed within 270 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about June 17, 2024 but the anticipated start date is provided solely for convenience and is neither certain nor binding. The Project is located at 1000 South Stelling Drive and is described as follows: . This project replaces and expands the existing play area in the southwest corner of Jollyman Park, with a new All-Inclusive play area and supporting facilities. The project generally involves installation of a new all-inclusive play area, associated play elements, picnic areas, fencing, custom interactive art piece, pathways, planting, restroom, irrigation, and utilities at an existing park. City permit documents have been submitted and are in process; Stormwater Maintenance Plan (SWMP) Report will be completed prior to the Contractor pulling permits. This Project requires a valid California contractor's license for the following classification(s): A - General Engineering Contractor The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents, in the manner set forth in Section 4 of the Instructions to Bidders. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board's In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR 2449 et seq.) (OffRoad Regulation), if applicable, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. Pursuant to California Labor Code 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. RFIs due date: Monday, April 15, 2pm Site work for an inclusive playground / park in Cupertino, California. This project replaces and expands the existing play area in the southwest corner of Jollyman Park, with a new AllInclusive play area and supporting facilities.

Bid Results

Playgrounds / Parks / Athletic Fields

$4,077,430.00

Public - City

Paving, Renovation, Site Work

63

27

2

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
69
Bidding Soon
1,420
All Active Projects
612
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.