Site work for a transportation facility in Salt Lake City, Utah. Completed plans call for site work for a transportation facility.

Construct a TRAX platform between the existing rails on Main Street between 600 South and 700 South. Including all pertinent equipment and mid-block cross walk. As of August 25 2023, this project has been completed. No track work or OCS work will be required. However, all workers will be required to obtain an RWP to work in the UTA Right-of-way (in 2021 may be obtained on-line) Approximate Budget Estimate $1,750,000 - $2,250,000 Project Start Date/Length July 2021/TBD Contract Type Firm Fixed Price Construction Funding Source Local DBE Goal None Bid Bond (5%) Performance Bond (Contractor will need to obtain a letter showing bond capacity & contractor can be bonded at bid submittal. Bond will be required at final contracting) Payment Bond (Bond will be required at final contracting) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. General Contractor will construct a light-rail TRAX platform in the area previously planned for a platform on Main Street between 600 and 700 South. The platform will include a concrete platform with high-blocks and canopies. Lighting of the area and a snowmelt system are included as are electrical and mechanical connections. A Mid-block crosswalk and ADA ramps will also be constructed at approximately 660 South. Assisting with the installation of an 'Art in Transit' art installation is also included. NO track or OCS work is required. However, all workers will be required to obtain an RWP to work in the UTA right-of-way (in 2021 may be obtained on-line). All work around tracks will require a no fee permit from UTA, including for work done by excavators. This permit application will allow UTA to determine if work planned around OCS poles will require a shutdown of the system Question Submission Close Date 5/3/2021 12:00 AM MDT

Occupancy

Transportation Terminals

$2,250,000.00

Public - State/Provincial

Site Work

106

32

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
545
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2021

July 1, 2021

img_map_placeholder

E 600 S & S 700 E, Salt Lake City, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.