Site work for a bridge / tunnel in Etobicoke, Ontario. Completed plans call for site work for a bridge / tunnel.
Work in this Contract comprises the replacement of Culvert No. 677. The work shall include, but not be limited to: - Access and protection for the work; - Supply, installation, maintenance, and removal of traffic control devices for vehicles and pedestrians; - Implementation of tree protection, erosion and sediment control measures; - Supply, installation, maintenance, and removal of temporary flow passage system and dewatering to isolate the work areas; - Locate, protect, and support existing utilities within the work zones; - Supply, installation, and removal of roadway protection/shoring for staged construction; - Partial/full depth removal of asphalt and replacement with new asphalt pavement; - Place/obliterate temporary/permanent pavement markings; - Replacement of concrete sidewalks, concrete curb and gutters, and steel beam guide rail to limits shown on the Contract Drawings; - Removal of concrete parapet walls and construction of new concrete head walls / parapet walls with railing; - Earth/rock excavation for structure and removal; - Removal of existing concrete box culvert and construction of new precast concrete open footing culvert on concrete footings; - Removal of existing reinforced concrete retaining walls and construction of new concrete retaining walls on spread footings; - Supply and place waterproofing on top of new culvert; - Replace sections of storm sewer and connect to new structures as shown on Contract Drawings; - Excavate and place new rock protection at culvert inlet and outlet, and construct low-flow channel within new culvert; - De-energize, relocate, and reinstate street light pole as shown on Contract Drawings; - Remove, replace, and relocate existing cable chamber to facilitate construction of new culvert; - Apply concrete surface sealer on all exposed cast-in-place concrete surfaces; - Site restoration; and - Other miscellaneous works as identified in the Contract documents. Documents and addenda can be obtained at: http://discovery.ariba.com/rfx/8257102 Owner does not track plan takers and/or interested bidders. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff
Award
Bridges / Tunnels
$3,824,328.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2020
July 9, 2020
The Westway, Etobicoke, ON
Related To This Project
Etobicoke, ON
--
Etobicoke, ON
Bid Date: Mar 04 2021
Etobicoke, ON
Bid Date: Jul 09 2020
Etobicoke, ON
Bid Date: Dec 17 2019
Etobicoke, ON
Bid Date: Jul 13 2021
Etobicoke, ON
Bid Date: Jun 16 2021
Etobicoke, ON
--
Etobicoke, ON
Bid Date: Aug 27 2019
Etobicoke, ON
Bid Date: Jun 30 2020
Etobicoke, ON
Bid Date: Jun 23 2021
Etobicoke, ON
Bid Date: Aug 18 2021
Etobicoke, ON
Bid Date: Apr 07 2020
Etobicoke, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.