Published September 11, 2020 at 8:00 PM

Updated May 23, 2024

Site work and paving for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done under this contract shall be started on or about September 14, 2020. All work under this contract shall be completed by December 1, 2023. The work under this contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 35.04 and Mile Post 36.70 in Cook County, Illinois. The work under this contract shall consist of: Widening and reconstruction of the Tri-State Tollway (I-294) from PR I-294 CL Sta. 1853+10.00 to EX I-294 CL Sta. 1918+00.00; Reconstruction of the Tri-State Tollway (I-294) BNs 285 & 286 over Grand Avenue; Reconstruction of the Tri-State Tollway (I-294) BNs 287 & 288 over the UPRR; Construction of Ramp S2 BN 1659, the exit ramp from NB Tri-State Tollway (I-294) to NB EOWA (I-490) roadway and structure; Construction of Ramp S1 BN1658, the entrance ramp from SB WA (I-490) to SB Tri-State Tollway (I-294) roadway and structure; Construction of median and outside retaining walls; ITS infrastructure; Relocation of Franklin Park utilities; Drainage improvements; Temporary lighting and permanent lighting; Maintenance of traffic operations; Installation of permanent pavement marking and signing; Erosion control measures and landscaping improvements; Protection of existing utilities within the construction zones; Temporary and permanent traffic signals at the intersection of County Line Road and Grand Avenue; Installation of underpass lighting on Grand Avenue; grading Pond S1/S2; Wolf Road BN 289 bridge deck repairs; and closure of the Tri-State Tollway (I-294) existing median crossover located from EX Sta. 1934+00.00 to Sta. 1940+54.42. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention jkim@getipass.com, to be received no later than 2:00 p.m. local time on May 14, 2020. A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low Bidder once the apparent low Bidder is determined. Each Bid must be accompanied by a Bid Guaranty in the amount of five (5%) per cent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. The Multi-Project Labor Agreement is not in effect for this contra

Award

Roads / Highways

$151,574,099.00

Public - State/Provincial

Paving, Site Work

8045

59

73

10

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
258
Bidding Soon
3,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2020

September 14, 2020

Project location map

Multiple Locations, Chicago, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.