BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Pagosa Springs, Colorado. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

SCOPE OF CONTRACT The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Remove trees and clear and grub as required. Excavate for foundation construction. Construct the abutments and wingwalls. Backfill the abutments to just below the beam seat elevation. Grade portions of the channel banks under the new bridge. Install riprap adjacent to the new structure. Erect the steel girders. Construct the bridge. Construct the remaining backfill and the approach embankments. Install the approach rails. Perform all work to required to construct aggregate surface. Open the new bridge to traffic. Prepare the finished grading and apply seeding PROJECT LOCATON Chama Basin Trail Bridge: The trail bridge will be located on a Forest Service Trail (FST) 738, which accesses the Rio Grande National Forest. The Chama Basin Trail Bridge No. 738-0.1 located on the Conejos Ranger District of the Rio Grande National Forest, Latitude 37.03497326, Longitude -106.5533922. Directions: From Chama, NM travel north on Highway 17 to the Chama River Road (FSR 121), turn left onto FSR 121, travel about 6 miles north to the Rio Grande NF boundary. Take the left fork about one mile to the new bridge location. MAGNITUDE OF CONSTRUCTION PROJECT The estimated price range of the project is between $25,000-$100,000 SITE VISIT Date: September 7, 2022 Time: 1400____________ Location: The coordinates are 37.032446N 106.554W and the directions are: From Antonito, CO, drive South on CO-17 S for 39 miles, continue on NM- 17 S for 3 miles, turn right on Co Rd 455/FSR-121, follow signs for Chama Basin Trailhead, approximately 6 miles. Period of Performance: 09/19/2022 to 07/31/2023

Post-Bid

Bridges / Tunnels

$100,000.00

Public - Federal

New Construction, Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
58
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

September 19, 2022

img_map_placeholder

1803 West Hwy 160, Pagosa Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.