BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a bridge / tunnel in Pagosa Springs, Colorado. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of December 12, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Question Acceptance Deadline 02/03/2023 02:00 PM EST Questions are submitted online Yes The Town of Pagosa Springs is seeking to qualify firms and/or individuals to develop a "1st Street Pedestrian Bridge Design". The plan will include labor, engineering, surveying, considerations for existing and future trail connections, future utility infrastructure accommodations, environmental clearances, floodway reviews, construction management, and a final plan. We have downloaded all file pertaining to this solicitation including published addendums. General Requirements - Bidder Prequalification/Preregistration Required - Contractors License Required - Insurance Required - License Required The method of contractor selection has not been determined at this time.

Design

Bridges / Tunnels

$15,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
14
Bidding Soon
129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

Project location map

To Be Determined, Pagosa Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.