Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Inglewood, California. Design plans call for the construction of a transportation facility; and warehouse / distribution facility.
https://la.urbanize.city/post/more-changes-inglewoods-18-billion-people-mover In the face of community pushback, the City of Inglewood has dropped plans a Vons supermarket on Manchester Avenue as part of its proposed automated people mover system, and will instead pursue an alternate loca tion for its vehicle maintenance facility. Southern California New Group reports that the city now intends to build the Inglewood Transit Connector's maintenance and storage facility on the same property as its Market Street Station. This would allow for the Vons, as well as other attached retail spaces, to remain in place. A project representative told SCNG that the updated plan would avoid disruptions to more than 100 employees on the site, while also saving money, as the City of Inglewood would no longer have to acquire the Vons property. Nonetheless, 41 other businesses with more than 300 employees are expected to be displaced during the construction process, though the city intends to foot the cost for any moving expenses. According to the report, three technologies are being considered for the people mover system, including a monorail which would be built by BYD, a rubber-tire tram proposed by Bombardier, and a cable pull system which would be built by Dopplemeyer. All alternatives involve automated vehicles traveling on an elevated, 1.6-mile guideway which would run above Market Street, Manchester Avenue, and Prairie Avenue. In addition to the northern terminus on Market Street adjacent to the K Line, plans also call for stops at Manchester Avenue and Hardy Avenue. That route would link Metro's Downtown Inglewood Station with SoFi Stadium and Intuit Dome, the future home of the Los Angeles Clippers. People mover map City of Inglewood To date, Inglewood has secured more than $760 million in funding for the project, which has an estimated total price tag of $1.85 billion. The most recent windfall was a more than $400-million award from the California State Transportation Agency, which is intended to help Inglewood compete for a Federal New Starts grant. Should the project secure Federal funding, construction could begin in 2024, with the system operating by the time the Summer Olympic Games return to Los Angeles in 2028. When operational, the ITC is expected to run on normal headways of six minutes, with service as frequent as every two minutes during NFL events. Ridership estimates forecast that up to 414 passengers would use the system during weekday peak-hour conditions, with up to 11,450 passengers using the people mover during NFL events. ______________ Fully elevated, automated, fixed transit system with three stations connecting Metro K Line to Inglewood's new activity centers. As of June 7, 2023, this project is to receive grant funding of $407 million. An environmental consultant has been selected. With the state funding, this project is anticipated to be completed in time for the 2028 Olympic Games. *This project is included in the initial compilation of projects for consideration in Metro's Mobility Concept Plan in relation to the 2028 Olympics. This list has not been reviewed by the Games Mobility Executives. This project will continue to be updated as further information becomes available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Transportation Terminals
$1,016,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2024
Multiple Locations, Inglewood, CA
Related To This Project
Inglewood, CA
Bid Date: Sep 16 2020
Inglewood, CA
Bid Date: Apr 27 2022
Inglewood, CA
Bid Date: Mar 29 2022
Inglewood, CA
Bid Date: Mar 02 2022
Inglewood, CA
Bid Date: May 25 2022
Inglewood, CA
Bid Date: Jun 08 2022
Inglewood, CA
Bid Date: Apr 13 2022
Inglewood, CA
--
Inglewood, CA
Bid Date: Mar 09 2022
Inglewood, CA
Bid Date: Jan 18 2023
Inglewood, CA
--
Inglewood, CA
Bid Date: Jul 27 2022
Inglewood, CA
Bid Date: Jan 17 2023
Inglewood, CA
Bid Date: Nov 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.