BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Inglewood, California. Design plans call for the construction of a transportation facility; and warehouse / distribution facility.

https://la.urbanize.city/post/more-changes-inglewoods-18-billion-people-mover In the face of community pushback, the City of Inglewood has dropped plans a Vons supermarket on Manchester Avenue as part of its proposed automated people mover system, and will instead pursue an alternate loca tion for its vehicle maintenance facility. Southern California New Group reports that the city now intends to build the Inglewood Transit Connector's maintenance and storage facility on the same property as its Market Street Station. This would allow for the Vons, as well as other attached retail spaces, to remain in place. A project representative told SCNG that the updated plan would avoid disruptions to more than 100 employees on the site, while also saving money, as the City of Inglewood would no longer have to acquire the Vons property. Nonetheless, 41 other businesses with more than 300 employees are expected to be displaced during the construction process, though the city intends to foot the cost for any moving expenses. According to the report, three technologies are being considered for the people mover system, including a monorail which would be built by BYD, a rubber-tire tram proposed by Bombardier, and a cable pull system which would be built by Dopplemeyer. All alternatives involve automated vehicles traveling on an elevated, 1.6-mile guideway which would run above Market Street, Manchester Avenue, and Prairie Avenue. In addition to the northern terminus on Market Street adjacent to the K Line, plans also call for stops at Manchester Avenue and Hardy Avenue. That route would link Metro's Downtown Inglewood Station with SoFi Stadium and Intuit Dome, the future home of the Los Angeles Clippers. People mover map City of Inglewood To date, Inglewood has secured more than $760 million in funding for the project, which has an estimated total price tag of $1.85 billion. The most recent windfall was a more than $400-million award from the California State Transportation Agency, which is intended to help Inglewood compete for a Federal New Starts grant. Should the project secure Federal funding, construction could begin in 2024, with the system operating by the time the Summer Olympic Games return to Los Angeles in 2028. When operational, the ITC is expected to run on normal headways of six minutes, with service as frequent as every two minutes during NFL events. Ridership estimates forecast that up to 414 passengers would use the system during weekday peak-hour conditions, with up to 11,450 passengers using the people mover during NFL events. ______________ Fully elevated, automated, fixed transit system with three stations connecting Metro K Line to Inglewood's new activity centers. As of June 7, 2023, this project is to receive grant funding of $407 million. An environmental consultant has been selected. With the state funding, this project is anticipated to be completed in time for the 2028 Olympic Games. *This project is included in the initial compilation of projects for consideration in Metro's Mobility Concept Plan in relation to the 2028 Olympics. This list has not been reviewed by the Games Mobility Executives. This project will continue to be updated as further information becomes available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Transportation Terminals

$1,016,000,000.00

Public - City

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
104
Bidding Soon
2,230
All Active Projects
870
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2024

img_map_placeholder

Multiple Locations, Inglewood, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.