BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a bridge / tunnel in Scarborough, Ontario. Completed plans call for site work for a bridge / tunnel.

The Work includes the rehabilitation of the existing culvert. Work to include, but not limited to, traffic control, control of water, erosion and sediment control, concrete removal and patching, new parapet wall and metal railing, backfill, road/curb/sidewalk reconstruction, landscaping and site restoration Delivery Schedule for Goods or Services OR Contract Duration: 170 Calendar Days from the Date of Order to Commence Site Works. Name of Trade Agreement(s) that is Applicable to the procurement: Chapter 5 of Canada Free Trade Agreement (CFTA); and Chapter 9 Trade and Cooperation Agreement between Ontario and Quebec (OQTCA). Any questions about this transition should be directed to City Bids at: citybids@toronto.ca

Award

Bridges / Tunnels

$1,375,880.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
255
Bidding Soon
4,960
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2020

July 1, 2020

Project location map

Warden Ave, Scarborough, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.