Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Topeka, Kansas. Conceptual plans call for the renovation of a water / sewer project.
The Water Main Replacement Program focuses on restoring mains located in areas with extensive break and repair history. In recent years, water main breaks have become more prevalent due to the aging infrastructure. Based on historic studies and experience in the United States, the average useful life for water mains range between 75-100 years, depending upon local (soil and environmental) conditions. Beyond this period, failure is imminent. Topeka's water distribution system consists of nearly 890 miles of transmission and neighborhood distribution water mains, ranging in size from 2 to 48 inches in diameter. Assuming the optimal asset life span of 100 years, an annual replacement program approaching eight plus (8.0 ) miles per year is required to mitigate continued progressive water main break rates. Replacement program efforts will also focus on needed replacements associated with half cent sales tax and other priority street improvement projects to be implemented by the City Engineering Division. This project is included in the city's FY 2022-2030 Capital Improvement Program. As of June 7, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *This project has been awarded and all trades have been let.
Conceptual
Water / Sewer
$6,500,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2023
To Be Determined, Topeka, KS
Related To This Project
Topeka, KS
Bid Date: Jun 02 2022
Topeka, KS
Bid Date: Apr 29 2022
Topeka, KS
Bid Date: Jun 08 2022
Topeka, KS
Bid Date: Jun 06 2022
Topeka, KS
Bid Date: Jun 09 2022
Topeka, KS
Bid Date: Jan 07 2021
Topeka, KS
Bid Date: Mar 16 2022
Topeka, KS
Bid Date: Feb 16 2022
Topeka, KS
Bid Date: Apr 14 2022
Topeka, KS
Bid Date: Apr 15 2022
Topeka, KS
Bid Date: Apr 05 2022
Topeka, KS
Bid Date: Apr 28 2022
Topeka, KS
Bid Date: Apr 21 2022
Topeka, KS
Bid Date: Apr 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.