BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling and addition to an educational facility in Springdale, Arkansas. Completed plans call for the addition of a 15,226-square-foot educational facility; for the demolition of a educational facility; for the remodel of a 65,930-square-foot educational facility; and for site work for a educational facility.

http://www.unit-conversion.info/texttools/remove-letter-accents/ George Elementary School in Springdale recently celebrated an upcoming remodel at a groundbreaking ceremony on the site of the school's former exterior gym. George Elementary School was struck by an EF-3 tornado on March 30, 2022, resulting in damage to the school's roof, exterior, playground, cafeteria and entrance awning. The school's exterior gym was completely destroyed. A school remodel was planned prior to the tornado and will include planned development, as well as tornado recovery work. The projected project will impact areas that include the school's gym, library, kitchen, main office and music classroom. The remodel will cost about $11.2 million and will be paid for by insurance proceeds, district funds and state partnership funding. Dr. Jared Cleveland, Springdale Public Schools superintendent, Justin Swope, George Elementary School principal, School Board members and representatives from Core Architecture and Milestone Construction attended the event. Family members of the school's namesake, Gene George of George's Inc., were also in attendance. ------------------------------------------------------------------------------------------------------------------------------------------- https://www.nwaonline.com/news/2023/may/22/george-elementary-has-ceremony-celebrates-start/ SPRINGDALE -- George Elementary School held a groundbreaking ceremony Monday on the site of the gymnasium that was destroyed by a tornado last year. School Principal Justin Swope, district Superintendent Jared Cleveland, members of the George family and School Board members attended the event. The EF-3 twister struck early on March 30, 2022. Aside from the gym being destroyed, the storm damaged the school's roof, exterior, playground, cafeteria and entrance awning, the district said. The remodel will cost about $11.2 million, the district said, with insurance proceeds, district funds and state partnership funding covering the cost. "It's the beginning of a new beginning, I guess," Swope said after the groundbreaking. "We are excited to finally get a chance to get the upgrades to our school, and we wanted to celebrate that." Most of the school's students attended the ceremony, gathering on the cement pad that was once the foundation of the old gym, which was separate from the main school building. The school's fifth-graders were away at the Little Olympics at Har-Ber High School. Core Architecture and Milestone Construction are leading the remodeling project, the district said. Print Headline: George Elementary celebrates groundbreaking ___________________________________________________________________________________________________________________________________ **NOTE from CM - We have had several requests to walk the existing building. We will have the building open at 4:30 this afternoon (March 13, 2023). If you are unable to attend and still need access let me know and I will try to coordinate a time tomorrow (March 14, 2023) or Wednesday (March 15, 2023).** Building & Earth Project No: BV220128 Bid Package 01A and 33A This project consist of construction of a new 15,226SF load bearing masonry and steel addition and renovation of the existing 65,930SF school. The work includes site demolition, earthwork, site utilities, site concrete, flexible pavement, landscaping, concrete, structural and miscellaneous steel, bar joist, metal decking, metal stairs, rough carpentry, millwork, composite decking, fluid applied membrane, metal wall panel & soffits, TPO roofing, roof hatch, firestopping, fire proofing, expansion joints, joint sealants, aluminum storefronts & entrances, hollow metal frames & doors, wood doors, finish hardware, glazing, mirrors, louvers, metal studs, drywall, ceilings, flooring, epoxy flooring, tile, acoustical panels, finishing & painting, signage, toilet accessories, flagpole, grills & screens, Knox box, davit crane, stage curtains, gymnasium equipment, window treatments, fire suppression, plumbing, HVAC, electrical, structured cabling, audio/visual systems, public address systems. Successful bidders providing a complete, responsive and responsible bid will be required to execute a contract with Milestone Construction Company, LLC. Bidders must be prepared to provide insurance as specified in the Construction Management Manual portion of the bidding documents. A 5% Bid Bond or cashier's check is required with the bid if bid exceeds $70,000. Bidders must comply with regulatory and licensing requirements of the State as well as all other applicable State & Federal statutes. To be considered, bidders must be licensed on the day of bid opening. Bidders must acknowledge all addenda on the bid proposal form. By providing a bid, your firm accepts the obligation to honor the bid for a period of 60 days after the bid opening. Milestone Construction Company & Springdale Schools reserve the right to reject any or all bids and to waive any informality or irregularity in any bid. Milestone Construction Company encourages all small, minority, and women-owned business enterprises to submit bids for this project.

Post-Bid

Educational

$10,000,000.00

Public - City

Addition, Demolition, Remodeling, Site Work

164

38

37

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
595
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

May 8, 2023

img_map_placeholder

2878 S Powell St, Springdale, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.