BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a military facility in San Diego, California. Completed plans call for the construction of a 62,000-square-foot military facility.

The project is to design and construct a new Child Development Center Complex consisting of two (2) single story Child Development Center facilities for infants, pre-toddlers, toddlers and pre-school aged children of military and authorized civilian personnel at Marine Corps Air Station (MCAS) Miramar, San Diego CA. It will consist of an Extra-Large (XL) (approximately 42,000sf) and a Medium (M) (approximately 20,000sf) classification. Combined total square feet for the two facilities shall not exceed 62,000 sf. The Child Development Center Complex shall provide adequate space for children between six weeks and 5 years of age. These two combined, will provide an essential facility offering military personnel and authorized civilians and their families with full time, quality childcare and development for about 462 children. This is in support of and in addition to the existing Facility Building 2740 located along Delta Road and Mitscher Way,which shall remain. The new facilities shall be single story reinforced Concrete Masonry Unit (CMU), reinforced concrete foundation, slab on grade and composite steel deck, standing seam metal roof over metal deck and steel framing. Functional programmed spaces will include entrance vestibule, lobby, reception/sign-in,administration offices and work areas, Multi-Purpose Room (Option 1 for XL), individual child activity rooms appropriately designed and sized for each children's age group, training room, staff break room, lactation room, central storage, restrooms for staff and public use, kitchen, laundry room, janitor's room, mechanical, electrical and telecommunication support spaces. Comply with the requirements of FC 4-740-14N Navy and Marine Corps Child Development Centers. Base Item 0001: MCON Project P-250 Design-Build Child Development Center at MCAS Miramar, San Diego, CA.The project is to design and construct a new Child Development Center Complex consisting of two (2) single story Child Development Center facilities for infants, pre-toddlers, toddlers and pre-school aged children of military and authorized civilian personnel at Marine Corps Air Station (MCAS) Miramar, San Diego CA. The Construction Cost Limitation (CCL) for Base Item 0001: $31,861,154. The Period of Performance for Base Item 0001 is 754 calendar days after award. The work will be located at Marine Corps Air Station(MCAS) Miramar, San Diego, California. *This project timeline has been extended due to the public health crisis. This project was originally scheduled to bid on 06/08/2020. Bid postponed to 06/22/2020

Post-Bid

Military

$20,000,000.00

Public - Federal

New Construction

335

57

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
26
Bidding Soon
726
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2020

August 26, 2020

img_map_placeholder

To Be Determined, San Diego, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.