BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2020 at 8:00 PM

Updated August 21, 2024

Site work and paving for a mixed-use development in Brockton, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Mary Cruise Kennedy Senior Center Parking and Site Improvement Project 10 Father Kenney Way. The project bid consists of furnishing all labor, materials, tools and equipment and incidentals required to establish a work zone, install support of excavation, remove and dispose existing pavement, concrete, sheds, fences, trees and vegetation, and install new pavement, sidewalks, curbing, bioretention area, including utility relocation and miscellaneous work and cleanup, and all work required by the Drawings and Specifications.

Award

Sidewalks / Parking Lot

$111,184.00

Public - City

Paving, Site Work

11

12

2

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
229
Bidding Soon
3,451
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2020

July 6, 2020

Project location map

10 Father Kenney Way, Brockton, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.