Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 10, 2020 at 8:00 PM
Updated January 26, 2024
Renovation of a municipal facility in Fitchburg, Wisconsin. Completed plans call for the renovation of a municipal facility.
In general the work consists of: Replacement of (2) Existing Condensing Boilers with (2) new Condensing Boilers, including the Boiler Intake and Venting Piping and roof repair work.. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.There will NOT be a pre-bid tour, refer to the Plans for pictures of existing conditions
Award
Municipal
$129,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2020
August 12, 2020
3911 Fish Hatchery Rd, Fitchburg, WI
Related To This Project
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Dec 08 2023
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Jan 10 2025
Fitchburg, WI
Bid Date: Dec 22 2023
Fitchburg, WI
Bid Date: Jan 17 2024
Fitchburg, WI
Bid Date: Oct 12 2023
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Oct 05 2021
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Feb 17 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
