BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Crofton, Maryland. Completed plans call for site work for a water / sewer project.

As of December 07, 2021, project was not yet been awarded. No estimated time frame yet. The Work includes the following major items: Rehabilitating the existing raw water main piping at the Crofton Meadows II Water Treatment Plant piping including, but not limited to: replacing an existing section of 36" ductile iron pipe; adding a new gate valve and new plug valve for isolation; adding a tapping sleeve and valve on a new 36" bypass line; installing a temporary line stop; all associated appurtenances and any other work necessary to complete the project at the Crofton Meadows II WTP A. The Contractor shall provide all labor, materials, equipment and services necessary for and incidental to construction of the proposed raw water main modifications complete and in place, including the protection and maintenance of existing structures, facilities and utilities and the restoration of disturbed or damaged property, all asspecified herein or shown on the Drawings. B. The Contractor shall be held solely responsible for all necessary coordination between the various County, State or Federal agencies, utility companies, his sub-contractors, and the Engineer for the duration of this Contract. C. The work generally consists of rehabilitating the existing raw water main piping at the Crofton Meadows II Water Treatment Plant including, but not limited to: replacing an existing section of 36" ductile iron pipe; new plug valve and gate valves for isolation; tapping sleeve and valve for a new 36" bypass line; installing a temporary line stop; all associated appurtenances, complete and in place, including the protection and maintenance of existing structures, facilities and utilities and restoration of disturbed or damaged property, all as specified herein or shown on the Contract Drawings.

Bid Results

Water / Sewer

$552,475.00

Public - County

Site Work

8

8

12

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
507
Active Projects
279
Bidding Soon
3,713
All Active Projects
1,549
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 5, 2021

December 22, 2021

April 19, 2022

img_map_placeholder

To Be Determined, Crofton, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.