BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Warrington, Pennsylvania. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The project involves improvements to existing storm drainage facilities within Warrington Village and The Fairways Sections in Warrington Township. The work to be performed under this Contract includes the replacement of various quantities of 15, 24, 30, and 36 CMP with HDPE pipe and the replacement of CMP. All construction will occur within Township roads and rights-of-way and will involve restoration of pavement and unimproved areas, and provision for all erosion and sedimentation control. In addition to the Base Contract work, the Township will consider potential Alternate/Add-On items that may be included, generally consisting of repairs of 18, 21, 36 and 42 CMP and the replacement of 75 linear feet of 18" CMP and 72 linear feet of 21" CMP with HDPE. Bids must be accompanied by a certified check, bank draft or bid bond issued by a surety company licensed to conduct business in the Commonwealth of Pennsylvania, in the amount of at least ten percent (10%) of the total Bid Amount made payable to the Township. Barry P. Luber, Warrington Township Manager'' Clarification Deadline: 6/10/2020 4:00 PM The project involves improvements to existing storm drainage facilities within Warrington Village and The Fairways Sections in Warrington Township. The work to be performed under this Contract includes the replacement of approximately 76 linear feet of 15” CMP with 15” HDPE; the replacement of 200 linear feet of 24” CMP with 24” HDPE; the replacement of 93 linear feet of 30” CMP with 30” HDPE, the replacement of 94 linear feet of 36” CMP with 36” HDPE; and the replacement of 121 linear feet of 18” x 24” CMP. All construction will occur within Township roads and rights-of-way and will involve restoration of pavement and unimproved areas, and provision for all erosion and sedimentation control. In addition to the Base Contract work, the Township will consider potential Alternate/AddOn items that may be included, generally consisting of repairs of 18”, 21”, 36” and 42” CMP and the replacement of 75 linear feet of 18” CMP and 72 linear feet of 21 ” CMP with HDPE

Award

Water / Sewer

$110,690.00

Public - City

Paving, Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
197
Bidding Soon
4,060
All Active Projects
1,877
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2020

July 17, 2020

img_map_placeholder

Multiple Locations, Warrington, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.