EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2020 at 8:00 PM

Updated November 14, 2023

Site work and paving for a transportation facility in Keene, New Hampshire. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

City of Keene, is seeking bids for Reconstruct Taxiway 'A' (3,500' X 35') Reconstruct Taxiway 'A3' (440' X 35') & Reconstruct Taxiway 'T' (250' X 5') Bid No. 01-20-32. The full solicitation is posted on the DuBois & King's portal. Questions regarding this project shall be directed to Mark Goodrich, PE (603-637-1043, MGoodrich@DuBois- King.com) or Jeffrey Titus, Manager of Purchasing and Contract Services, in writing, via the current project database electronically. The hyperlink will be sent to all bidders that have downloaded a copy of the plans. Once the bidder requests plans via the portal, an email will be sent to the email address provided containing a link to download the bid documents and plan set. Addendums and other additional or revised Contract Documents will be available electronically only and it is the Bidder's sole responsibility to check the portal for additions or revisions up to the day prior to the due date for Proposals listed above. Addendums and other additional or revised Contract Documents will not be transmitted directly to Bidders or Plan Holders. Bid Security: Each bidder must deposit with his bid, security in the amount of 5% of the total amount of the bid. Bid security may be in the form of a certified check drawn upon a bank within the State of New Hampshire, or a bid bond executed by a surety company authorized to do business in the State of New Hampshire, made payable to the Owner. The successful bidder must furnish a 100% Performance Bond and a separate 100% Payment Bond and will be required to execute the Contract Agreement within 10 days following notification of the acceptance of his bid. The Owner reserves the right to reject any or all bids, to accept any bid, to waive any informality on bids received, and to omit any item or items deemed advisable for the best interest of the Owner. Attention of bidders is called particularly to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under contract. Bidders will be expected to comply with DBE requirements of 49CFR Part 23. The requirements for bidders and contractors under this order are explained in the contract documents. No bidder may withdraw his bid within 180 days after the actual date of the opening thereof.

Award

Transportation Terminals

$1,389,836.00

Public - City

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Special Purpose Lighting, Obstruction Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Electrical Utilities, Utility Transformers, Site Grounding, Site Lightning Protection
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
181
Bidding Soon
2,780
All Active Projects
1,172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2020

September 1, 2020

img_map_placeholder

80 Airport Rd, Keene, NH

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Reconstruct Taxiway "A", Reconstruct Taxiway "A3" and Reconstruct Taxiway "T"

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.