BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Dayton, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Asphalt pavement overlay improvements to existing City streets and associated work, including upgrade or replacement of select pedestrian ramps at existing intersection pedestrian crossing. HMAC Quantities. General overlay limits are shown on maps in Appendix A. Each bidder shall be solely and entirely responsible for determining the quantities of HMAC pavement required to complete the pre-level work and the overlay under each lump sum bid item. The actual overlay limits (start & stop locations along each street segment, and edge of overlay) will be painted in the field for inspection and reference by the bidders (painting to be completed within 3 days after initial advertisement for bid). Pre-level paving shall result in a smooth, uniform surface (from centerline to edge of pavement). The overlay shall be to the specified minimum thickness and extend to the existing edge of pavement (or painted limits where this is greater). Failure by the Contractor to accurately determine the actual quantities required will not entitle the contractor to any claim for additional compensation, unless the City modifies the limits of the required overlay in writing. Bid items to include edge grinding where overlay will be adjacent to existing curbs. Pedestrian Ramp & Sidewalk Quantities. General location of pedestrian ramps & sidewalk extensions are noted on maps. Each bidder shall be solely and entirely responsible for determining the quantities of concrete required to complete the construction of new pedestrian ramps, new curbs, sidewalk replacement or extension under each lump sum bid item. The general pedestrian ramp replacement locations (at each applicable intersection) will be painted in the field for inspection and reference by the bidders (painting to be completed within 3 days after initial advertisement for bid). Bidders shall verify actual quantities & limits required to comply with slope limitations listed on the drawing details on in the specifications, as required to meet ADA and PROWAG standards. Failure by the Contractor to accurately determine the actual quantities required will not entitle the contractor to any claim for additional compensation, unless the City modifies the limits of the required sidewalks in writing. Bid items to include sawcutting & removal of portions of existing sidewalks or walkways as applicable.

Award

Roads / Highways

$115,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
64
Bidding Soon
1,095
All Active Projects
420
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2020

July 6, 2020

img_map_placeholder

5th St, Dayton, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.