BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Maple Grove, Minnesota. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

As of June 30 , 2020 Eureka Construction, Inc. bid amount of $1,291,413.30 were awarded the contract. The anticipated start date is early to mid July. Bids are for the furnishing of all labor and materials and all else necessary, consisting primarily of the following estimated quantities: Said Construction Generally Consists of Roadway, Storm Sewer, and Turf Establishment. Approximate quantities are as follows: Excavation 9100 Cu. Yd. Select Granular Borrow 2000 Cu. Yd. Aggregate Base Class 5 1700 Cu. Yd. Bituminous Pavement 1500 Ton Concrete Curb and Gutter 2550 Lin. Ft. Storm Sewer (15"-21") 1000 Lin. Ft. Drainage Structures 25 Each 4", 6" Concrete Sidewalk 5300 Sq. Ft. 2.5" Bituminous Trail 16100 Sq. Ft. Water Main (6"-16") 1350 Lin. Ft. Sanitary Sewer (8") 630 Lin. Ft. Lighting 6 Each This project is subject to Prevailing Wage Rates. Each bid shall be accompanied by a bidder's bond naming the City of Maple Grove as obligee, certified check payable to the City Clerk of the City of Maple Grove or a cash deposit equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the City in the event that the bidder fails to enter into a contract. Each bid shall also be accompanied by an approved affirmative action certification. The City Council reserves the right to retain the deposits of the three lowest bidders for a period not to exceed 30 days after the date and time set for the opening of bids. No bids will be withdrawn for a period of 30 days after the date and time set for opening bids. Payment for the work will be by cash or check. The Council reserves the right to reject any and all bids, to waive irregularities and informalities therein and further reserves the right to award the contract to the best interest of the City.

Award

Roads / Highways

$1,291,413.00

Public - City

Paving, Site Work

64

1

3

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
785
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2020

July 13, 2020

img_map_placeholder

18695 73rd Ave N, Maple Grove, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.