BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Santa Cruz, California. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of June 2023, the project is in schematic design and construction documents are expected to be complete in the spring of 2024. Construction is expected to begin in the summer of 2025. Closed solicitation has been included below for reference. .......... The project generally includes design and creation of construction bid documents for a 2.5-mile long multi-use pathway for bicyclists and pedestrians adjacent to an existing, functional rail line. Design and bid documents must comply with California Environmental Quality Act (CEQA) and National Environmental Protection Act (NEPA) and various permitting agencies. The project plans and specifications will be split into two distinct projects and bid packages for future bidding and permitting phases. The design and environmental services contract is estimated at $3,900,000 with two sets of final plans, specifications, and environmental clearance anticipated to be complete by early 2022. Construction is expected to take approximately two years and is estimated at $23,000,000. Construction is currently not funded. Note: The selection of a firm to provide the described scope of services will not be made on cost but based on the consideration of qualifications-related factors contained in this Request for Qualifications. The City of Santa Cruz reserves the right to reject any and all bids and waive any irregularity or minor defects in any proposal received. The City and County of Santa Cruz are soliciting Statement of Qualifications (SOQ's) from qualified firms that will perform the design, engineering, final plans, specifications, and estimate, and environmental permitting for the Monterey Bay Sanctuary Scenic Trail (MBSST) Segment 8 and 9 (Pacific Ave. to 17th Ave). The City of Santa is taking the lead on soliciting for project proposals and will be working closely with County Public Works staff. The project is both state and federally funded, with a 32% local match. Note that this project has a DBE goal of 18%. The method of contractor selection has not been determined at this time.

Design

Roads / Highways

$23,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
66
Bidding Soon
1,296
All Active Projects
541
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

img_map_placeholder

Multiple Locations, Santa Cruz, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.